Mass AMI Smart Electricity Meter Swap Route

Product family: 100-Meters/Crew Daily Swap.

Flow: DLMS Smart Meters & Seals → Geo-Routed Appointment Batch → Safety Outage Check & Unseal → DIN Rail Swap & Torque Cover → RF Mesh Ping & Head-End Sync → Old Meter Scrape & Tamper Seal → Distribution Utility Customers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Mass AMI Smart Electricity Meter Swap RouteSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. DLMS Smart Meters & Seals → Geo-Routed Appointment Batch (27.4 s) → Safety Outage Check & Unseal (32.4 s) → DIN Rail Swap & Torque Cover (45.0 s) → RF Mesh Ping & Head-End Sync (31.6 s) → Old Meter Scrape & Tamper Seal (20.8 s) → Distribution Utility Customers.SUPPLIERDLMS SmartMeters & SealsI1.80 d1Geo-RoutedAppointment BatchC/T 27.4 sI1.60 d2Safety OutageCheck & UnsealC/T 32.4 sI2.20 d3DIN Rail Swap &Torque CoverC/T 45.0 sI0.90 d4RF Mesh Ping &Head-End SyncC/T 31.6 sI0.40 d5Old Meter Scrape& Tamper SealC/T 20.8 sI0.50 dCUSTOMERDistributionUtility…650 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Geo-Routed Appointment Batch27.4 s15 min96%95.8%1951,170 (1.80 d)806
2. Safety Outage Check & Unseal32.4 s20 min93%97.6%2601,040 (1.60 d)672
3. DIN Rail Swap & Torque Cover45.0 s30 min85%94.5%1951,430 (2.20 d)375
4. RF Mesh Ping & Head-End Sync31.6 s12 min94%97.8%130585 (0.90 d)681
5. Old Meter Scrape & Tamper Seal20.8 s5 min98%99.4%65260 (0.40 d)1,124

Key figures

Takt time
41.5 s
Lead time
7.41 d
Value-added time
157 s
Process cycle efficiency (PCE)
0.079%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
650 units
Line capacity per day
375 units
Bottleneck
DIN Rail Swap & Torque Cover

Reading the bottleneck

The bottleneck is "DIN Rail Swap & Torque Cover": it can process 375 units per day against a demand of 650 units, so it falls short of demand by 42.3%. Once downtime and scrap are counted, its cycle time grows from 45.0 s to 56.0 s, against a takt of 41.5 s. The largest loss at this step is changeovers (30 min every 195 units), about 9.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.