2GW Offshore HVDC Converter Thyristor Maintenance

Product family: Annual Valve Hall Check.

Flow: IGBT/Thyristor Sub-Modules → Valve Hall Earthing & Access → Water-Cooled Resistor Leak → Laser Fiber Firing Calibration → Capacitor Bank & Surge Check → Bipole Energize Ramp Back → Subsea Interconnectors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 2GW Offshore HVDC Converter Thyristor MaintenanceSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. IGBT/Thyristor Sub-Modules → Valve Hall Earthing & Access (4,455 s) → Water-Cooled Resistor Leak (5,265 s) → Laser Fiber Firing Calibration (7,290 s) → Capacitor Bank & Surge Check (5,130 s) → Bipole Energize Ramp Back (3,375 s) → Subsea Interconnectors.SUPPLIERIGBT/ThyristorSub-ModulesI1.75 d1Valve HallEarthing & AccessC/T 4,455 sI1.50 d2Water-CooledResistor LeakC/T 5,265 sI2.25 d3Laser FiberFiring…C/T 7,290 sI1.00 d4Capacitor Bank &Surge CheckC/T 5,130 sI0.50 d5Bipole EnergizeRamp BackC/T 3,375 sI0.50 dCUSTOMERSubseaInterconnectors4 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Valve Hall Earthing & Access4,455 s15 min96%95.8%17 (1.75 d)5
2. Water-Cooled Resistor Leak5,265 s20 min93%97.6%26 (1.50 d)4
3. Laser Fiber Firing Calibration7,290 s30 min85%94.5%19 (2.25 d)3
4. Capacitor Bank & Surge Check5,130 s12 min94%97.8%14 (1.00 d)5
5. Bipole Energize Ramp Back3,375 s5 min98%99.4%12 (0.50 d)8

Key figures

Takt time
6,750 s
Lead time
8.45 d
Value-added time
25,515 s
Process cycle efficiency (PCE)
11.2%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
4 cases
Line capacity per day
3 cases
Bottleneck
Laser Fiber Firing Calibration

Reading the bottleneck

The bottleneck is "Laser Fiber Firing Calibration": it can process 3 cases per day against a demand of 4 cases, so it falls short of demand by 30.6%. Once downtime and scrap are counted, its cycle time grows from 7,290 s to 9,076 s, against a takt of 6,750 s. The largest loss at this step is changeovers (30 min every 1 units), about 1,800 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Power Grids, Substations & Smart Metering: Power Grids, Substations & Smart Metering