Municipal Streetlight Zhaga-D4i Smart LED Retro
Product family: 70% City Energy Cut Program.
Flow: LED Luminaires & LoRa Nodes → Bucket Truck Pole Reach → Old Sodium Head Disassemble → D4i LED Head & Tilt Bolt → Zhaga Node Auto-GPS Commission → Night Dimming Schedule Verify → City Public Works
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Bucket Truck Pole Reach | 56.0 s | 15 min | 96% | 95.8% | 96 | 576 (1.80 d) | 394 |
| 2. Old Sodium Head Disassemble | 66.0 s | 20 min | 93% | 97.6% | 128 | 512 (1.60 d) | 330 |
| 3. D4i LED Head & Tilt Bolt | 91.0 s | 30 min | 85% | 94.5% | 96 | 704 (2.20 d) | 185 |
| 4. Zhaga Node Auto-GPS Commission | 64.0 s | 12 min | 94% | 97.8% | 64 | 288 (0.90 d) | 336 |
| 5. Night Dimming Schedule Verify | 42.0 s | 5 min | 98% | 99.4% | 32 | 128 (0.40 d) | 557 |
Key figures
- Takt time
- 84.4 s
- Lead time
- 7.41 d
- Value-added time
- 319 s
- Process cycle efficiency (PCE)
- 0.16%
- Rolled throughput yield (RTY)
- 85.9%
- Customer demand per day
- 320 units
- Line capacity per day
- 185 units
- Bottleneck
- D4i LED Head & Tilt Bolt
Reading the bottleneck
The bottleneck is "D4i LED Head & Tilt Bolt": it can process 185 units per day against a demand of 320 units, so it falls short of demand by 42.1%. Once downtime and scrap are counted, its cycle time grows from 91.0 s to 113 s, against a takt of 84.4 s. The largest loss at this step is changeovers (30 min every 96 units), about 18.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Power Grids, Substations & Smart Metering: Power Grids, Substations & Smart Metering
- 220kV Air-Insulated Grid Substation Bay Build
- Mass AMI Smart Electricity Meter Swap Route
- 63kV Overhead Aluminum HTLS Reconductoring
- 110kV XLPE Underground Cable Splice & HiPot
- Storm Distribution Feeder Fault Isolation & Restore
- PWR Nuclear Power Plant Refueling Outage (RFO)
- 450MW Gas Turbine Hot-Gas-Path Inspection
- Electric Bus Depot 3MW Grid Transformer Upgrade
- 2GW Offshore HVDC Converter Thyristor Maintenance
- Substation IEC-61850 Protection Relay Maintenance
- Industrial Islandable Solar+Genset Microgrid