Municipal Streetlight Zhaga-D4i Smart LED Retro

Product family: 70% City Energy Cut Program.

Flow: LED Luminaires & LoRa Nodes → Bucket Truck Pole Reach → Old Sodium Head Disassemble → D4i LED Head & Tilt Bolt → Zhaga Node Auto-GPS Commission → Night Dimming Schedule Verify → City Public Works

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Municipal Streetlight Zhaga-D4i Smart LED RetroSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. LED Luminaires & LoRa Nodes → Bucket Truck Pole Reach (56.0 s) → Old Sodium Head Disassemble (66.0 s) → D4i LED Head & Tilt Bolt (91.0 s) → Zhaga Node Auto-GPS Commission (64.0 s) → Night Dimming Schedule Verify (42.0 s) → City Public Works.SUPPLIERLED Luminaires& LoRa NodesI1.80 d1Bucket Truck PoleReachC/T 56.0 sI1.60 d2Old Sodium HeadDisassembleC/T 66.0 sI2.20 d3D4i LED Head &Tilt BoltC/T 91.0 sI0.90 d4Zhaga NodeAuto-GPS…C/T 64.0 sI0.40 d5Night DimmingSchedule VerifyC/T 42.0 sI0.50 dCUSTOMERCity PublicWorks320 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Bucket Truck Pole Reach56.0 s15 min96%95.8%96576 (1.80 d)394
2. Old Sodium Head Disassemble66.0 s20 min93%97.6%128512 (1.60 d)330
3. D4i LED Head & Tilt Bolt91.0 s30 min85%94.5%96704 (2.20 d)185
4. Zhaga Node Auto-GPS Commission64.0 s12 min94%97.8%64288 (0.90 d)336
5. Night Dimming Schedule Verify42.0 s5 min98%99.4%32128 (0.40 d)557

Key figures

Takt time
84.4 s
Lead time
7.41 d
Value-added time
319 s
Process cycle efficiency (PCE)
0.16%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
320 units
Line capacity per day
185 units
Bottleneck
D4i LED Head & Tilt Bolt

Reading the bottleneck

The bottleneck is "D4i LED Head & Tilt Bolt": it can process 185 units per day against a demand of 320 units, so it falls short of demand by 42.1%. Once downtime and scrap are counted, its cycle time grows from 91.0 s to 113 s, against a takt of 84.4 s. The largest loss at this step is changeovers (30 min every 96 units), about 18.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.