63kV Overhead Aluminum HTLS Reconductoring
Product family: High-Temp Low-Sag Capacity Up.
Flow: Composite-Core Carbon Conductor → Line Outage & Earth Clamp Fit → Drone Pilot Line Puller String → Tensioner Dead-End Compress → Sag Check Laser & Spacer → Helicopter Corona Patrol & On → Regional Distribution Grids
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Line Outage & Earth Clamp Fit | 1,485 s | 15 min | 96% | 95.8% | 4 | 22 (1.83 d) | 15 |
| 2. Drone Pilot Line Puller String | 1,755 s | 20 min | 93% | 97.6% | 5 | 19 (1.58 d) | 12 |
| 3. Tensioner Dead-End Compress | 2,430 s | 30 min | 85% | 94.5% | 4 | 26 (2.17 d) | 7 |
| 4. Sag Check Laser & Spacer | 1,710 s | 12 min | 94% | 97.8% | 2 | 11 (0.92 d) | 12 |
| 5. Helicopter Corona Patrol & On | 1,125 s | 5 min | 98% | 99.4% | 1 | 5 (0.42 d) | 23 |
Key figures
- Takt time
- 2,250 s
- Lead time
- 7.73 d
- Value-added time
- 8,505 s
- Process cycle efficiency (PCE)
- 4.1%
- Rolled throughput yield (RTY)
- 85.9%
- Customer demand per day
- 12 cases
- Line capacity per day
- 7 cases
- Bottleneck
- Tensioner Dead-End Compress
Reading the bottleneck
The bottleneck is "Tensioner Dead-End Compress": it can process 7 cases per day against a demand of 12 cases, so it falls short of demand by 40.5%. Once downtime and scrap are counted, its cycle time grows from 2,430 s to 3,025 s, against a takt of 2,250 s. The largest loss at this step is changeovers (30 min every 4 units), about 450 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Power Grids, Substations & Smart Metering: Power Grids, Substations & Smart Metering
- 220kV Air-Insulated Grid Substation Bay Build
- Mass AMI Smart Electricity Meter Swap Route
- 110kV XLPE Underground Cable Splice & HiPot
- Storm Distribution Feeder Fault Isolation & Restore
- PWR Nuclear Power Plant Refueling Outage (RFO)
- 450MW Gas Turbine Hot-Gas-Path Inspection
- Electric Bus Depot 3MW Grid Transformer Upgrade
- 2GW Offshore HVDC Converter Thyristor Maintenance
- Municipal Streetlight Zhaga-D4i Smart LED Retro
- Substation IEC-61850 Protection Relay Maintenance
- Industrial Islandable Solar+Genset Microgrid