PWR Nuclear Power Plant Refueling Outage (RFO)
Product family: 21-Day Critical-Path Refuel.
Flow: Reactor Fuel Vendors → Reactor Cooldown & Head Lift → Fuel Pool Shuffle & Reload → Steam Generator Eddy-Current → Reactor Head Stud Tension → Hot Functional Criticality → Baseload Nuclear Grid
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Reactor Cooldown & Head Lift | 26,730 s | 15 min | 96% | 95.8% | 1 | 4 (2.00 d) | 3 |
| 2. Fuel Pool Shuffle & Reload | 31,590 s | 20 min | 93% | 97.6% | 1 | 3 (1.50 d) | 2 |
| 3. Steam Generator Eddy-Current | 43,740 s | 30 min | 85% | 94.5% | 1 | 4 (2.00 d) | 1 |
| 4. Reactor Head Stud Tension | 30,780 s | 12 min | 94% | 97.8% | 1 | 2 (1.00 d) | 2 |
| 5. Hot Functional Criticality | 20,250 s | 5 min | 98% | 99.4% | 1 | 1 (0.50 d) | 4 |
Key figures
- Takt time
- 40,500 s
- Lead time
- 9.39 d
- Value-added time
- 153,090 s
- Process cycle efficiency (PCE)
- 20.1%
- Rolled throughput yield (RTY)
- 85.9%
- Customer demand per day
- 2 cases
- Line capacity per day
- 1 cases
- Bottleneck
- Steam Generator Eddy-Current
Reading the bottleneck
The bottleneck is "Steam Generator Eddy-Current": it can process 1 cases per day against a demand of 2 cases, so it falls short of demand by 27.3%. Once downtime and scrap are counted, its cycle time grows from 43,740 s to 54,454 s, against a takt of 40,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 7,719 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Power Grids, Substations & Smart Metering: Power Grids, Substations & Smart Metering
- 220kV Air-Insulated Grid Substation Bay Build
- Mass AMI Smart Electricity Meter Swap Route
- 63kV Overhead Aluminum HTLS Reconductoring
- 110kV XLPE Underground Cable Splice & HiPot
- Storm Distribution Feeder Fault Isolation & Restore
- 450MW Gas Turbine Hot-Gas-Path Inspection
- Electric Bus Depot 3MW Grid Transformer Upgrade
- 2GW Offshore HVDC Converter Thyristor Maintenance
- Municipal Streetlight Zhaga-D4i Smart LED Retro
- Substation IEC-61850 Protection Relay Maintenance
- Industrial Islandable Solar+Genset Microgrid