PWR Nuclear Power Plant Refueling Outage (RFO)

Product family: 21-Day Critical-Path Refuel.

Flow: Reactor Fuel Vendors → Reactor Cooldown & Head Lift → Fuel Pool Shuffle & Reload → Steam Generator Eddy-Current → Reactor Head Stud Tension → Hot Functional Criticality → Baseload Nuclear Grid

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: PWR Nuclear Power Plant Refueling Outage (RFO)Supplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Reactor Fuel Vendors → Reactor Cooldown & Head Lift (26,730 s) → Fuel Pool Shuffle & Reload (31,590 s) → Steam Generator Eddy-Current (43,740 s) → Reactor Head Stud Tension (30,780 s) → Hot Functional Criticality (20,250 s) → Baseload Nuclear Grid.SUPPLIERReactor FuelVendorsI2.00 d1Reactor Cooldown& Head LiftC/T 26,730 sI1.50 d2Fuel Pool Shuffle& ReloadC/T 31,590 sI2.00 d3Steam GeneratorEddy-CurrentC/T 43,740 sI1.00 d4Reactor Head StudTensionC/T 30,780 sI0.50 d5Hot FunctionalCriticalityC/T 20,250 sI0.50 dCUSTOMERBaseloadNuclear Grid2 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Reactor Cooldown & Head Lift26,730 s15 min96%95.8%14 (2.00 d)3
2. Fuel Pool Shuffle & Reload31,590 s20 min93%97.6%13 (1.50 d)2
3. Steam Generator Eddy-Current43,740 s30 min85%94.5%14 (2.00 d)1
4. Reactor Head Stud Tension30,780 s12 min94%97.8%12 (1.00 d)2
5. Hot Functional Criticality20,250 s5 min98%99.4%11 (0.50 d)4

Key figures

Takt time
40,500 s
Lead time
9.39 d
Value-added time
153,090 s
Process cycle efficiency (PCE)
20.1%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
2 cases
Line capacity per day
1 cases
Bottleneck
Steam Generator Eddy-Current

Reading the bottleneck

The bottleneck is "Steam Generator Eddy-Current": it can process 1 cases per day against a demand of 2 cases, so it falls short of demand by 27.3%. Once downtime and scrap are counted, its cycle time grows from 43,740 s to 54,454 s, against a takt of 40,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 7,719 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.