Mining, Quarries, Lithium & Refining VSM Scenarios
12 scenarios of Mining, Quarries, Lithium & Refining, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Pit Haul & Dump Hopper → Primary Jaw Crush & Screen → Flotation / Leaching Beneficiate → Wash, Dewater & XRF Assay → Stockpile Rail & Weighbridge. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Crushing, Screening & Bulk Rail Dispatch | 270 batches per day | 2 | 200 s | 8.81 d | 0.16% | Jaw Crusher & Screening |
| 60,000-TPD Copper Porphyry SAG Mill & Flotation | 420 tonnes per day | 3 | 193 s | 8.81 d | 0.11% | SAG & Ball Mill Hydrocyclone |
| Carbon-in-Leach (CIL) Gold Ore Extraction | 85 batches per day | 3 | 953 s | 8.85 d | 0.52% | Gravity Centrifugal Concentrator |
| Phosphate Ore Calcination, Scrub & Pipeline | 680 tonnes per day | 3 | 119 s | 8.81 d | 0.065% | Attrition Scrubber & Cyclones |
| Direct Lithium Extraction (DLE) & Li2CO3 Plant | 95 tonnes per day | 3 | 853 s | 8.84 d | 0.46% | DLE Ion-Sieve Adsorption Skid |
| Magnetite Iron Ore Concentrator & Induration | 850 tonnes per day | 3 | 95.3 s | 8.80 d | 0.052% | Low-Intensity Magnetic Sep |
| Caustic Bauxite Digestion to Smelter Alumina | 720 tonnes per day | 3 | 113 s | 8.81 d | 0.062% | 240°C High-Pressure Digestion |
| Exploration Diamond Core Logging & Fire-Assay Lab | 420 samples per day | 2 | 129 s | 8.81 d | 0.11% | Hyperspectral SWIR Mineral Scan |
| 240-Ton Electric Haul Truck 15,000-Hr Overhaul | 2 units per day | 2 | 27,000 s | 10.5 d | 18.7% | Frame Mag-Particle Crack Weld |
| Automated Autonomous Drill-Blast-Load Mine Bench | 32 batches per day | 2 | 1,688 s | 8.90 d | 1.4% | Autonomous Rotary Blast Drill |
| Granular Muriate of Potash (MOP) Compaction | 520 tonnes per day | 3 | 156 s | 8.81 d | 0.085% | Smooth-Roll High-Force Flake |
| Solar Sea-Salt Wash, Vacuum Evaporate & Iodize | 340 tonnes per day | 2 | 159 s | 8.81 d | 0.13% | Fluid-Bed Dryer & Sieve Cut |