Exploration Diamond Core Logging & Fire-Assay Lab

Product family: Automated Core Scanner Flow.

Flow: Diamond Drill Rig Cores → Core Box Wash, Photo & RQD → Hyperspectral SWIR Mineral Scan → Diamond Saw Split-Core Sample → Jaw/Pulverize & 50g Fire Assay → ICP-MS Data Check & QAQC → Resource Geologists

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Exploration Diamond Core Logging & Fire-Assay LabSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Diamond Drill Rig Cores → Core Box Wash, Photo & RQD (93.0 s) → Hyperspectral SWIR Mineral Scan (139 s) → Diamond Saw Split-Core Sample (108 s) → Jaw/Pulverize & 50g Fire Assay (90.0 s) → ICP-MS Data Check & QAQC (72.0 s) → Resource Geologists.SUPPLIERDiamond DrillRig CoresI1.40 d1Core Box Wash,Photo & RQDC/T 93.0 sI2.20 d2HyperspectralSWIR Mineral ScanC/T 139 sI1.60 d3Diamond SawSplit-Core SampleC/T 108 sI1.00 d4Jaw/Pulverize &50g Fire AssayC/T 90.0 sI1.20 d5ICP-MS Data Check& QAQCC/T 72.0 sI1.40 dCUSTOMERResourceGeologists420 / samples

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Core Box Wash, Photo & RQD93.0 s10 min92%98.8%420588 (1.40 d)522
2. Hyperspectral SWIR Mineral Scan139 s35 min81%95.0%420924 (2.20 d)287
3. Diamond Saw Split-Core Sample108 s20 min91%97.2%336672 (1.60 d)430
4. Jaw/Pulverize & 50g Fire Assay90.0 s10 min95%98.4%168420 (1.00 d)545
5. ICP-MS Data Check & QAQC72.0 s8 min97%99.4%168504 (1.20 d)707

Key figures

Takt time
129 s
Lead time
8.81 d
Value-added time
502 s
Process cycle efficiency (PCE)
0.11%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
420 samples
Line capacity per day
287 samples
Bottleneck
Hyperspectral SWIR Mineral Scan

Reading the bottleneck

The bottleneck is "Hyperspectral SWIR Mineral Scan": it can process 287 samples per day against a demand of 420 samples, so it falls short of demand by 31.6%. Once downtime and scrap are counted, its cycle time grows from 139 s to 181 s, against a takt of 129 s. The largest loss at this step is equipment downtime (uptime 81%), about 32.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Mining, Quarries, Lithium & Refining: Mining, Quarries, Lithium & Refining