240-Ton Electric Haul Truck 15,000-Hr Overhaul

Product family: Zero-Hour Frame & Wheel Rebuild.

Flow: Mining Truck OEM Modules → Steam Degrease & Body Pull → Frame Mag-Particle Crack Weld → New 3500HP Engine & Grid Drop → Wheel-Motor & Tire Torque → Pit Haul Loaded Dyno Test → Active Mine Dispatch

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 240-Ton Electric Haul Truck 15,000-Hr OverhaulSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Mining Truck OEM Modules → Steam Degrease & Body Pull (19,440 s) → Frame Mag-Particle Crack Weld (29,160 s) → New 3500HP Engine & Grid Drop (22,680 s) → Wheel-Motor & Tire Torque (18,900 s) → Pit Haul Loaded Dyno Test (15,120 s) → Active Mine Dispatch.SUPPLIERMining TruckOEM ModulesI1.50 d1Steam Degrease &Body PullC/T 19,440 sI2.00 d2FrameMag-Particle…C/T 29,160 sI1.50 d3New 3500HP Engine& Grid DropC/T 22,680 sI1.00 d4Wheel-Motor &Tire TorqueC/T 18,900 sI1.00 d5Pit Haul LoadedDyno TestC/T 15,120 sI1.50 dCUSTOMERActive MineDispatch2 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Steam Degrease & Body Pull19,440 s10 min92%98.8%23 (1.50 d)2
2. Frame Mag-Particle Crack Weld29,160 s35 min81%95.0%24 (2.00 d)1
3. New 3500HP Engine & Grid Drop22,680 s20 min91%97.2%23 (1.50 d)2
4. Wheel-Motor & Tire Torque18,900 s10 min95%98.4%12 (1.00 d)3
5. Pit Haul Loaded Dyno Test15,120 s8 min97%99.4%12 (1.00 d)3

Key figures

Takt time
27,000 s
Lead time
10.5 d
Value-added time
105,300 s
Process cycle efficiency (PCE)
18.7%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
2 units
Line capacity per day
1 units
Bottleneck
Frame Mag-Particle Crack Weld

Reading the bottleneck

The bottleneck is "Frame Mag-Particle Crack Weld": it can process 1 units per day against a demand of 2 units, so it falls short of demand by 31.5%. Once downtime and scrap are counted, its cycle time grows from 29,160 s to 37,895 s, against a takt of 27,000 s. The largest loss at this step is equipment downtime (uptime 81%), about 6,840 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Mining, Quarries, Lithium & Refining: Mining, Quarries, Lithium & Refining