60,000-TPD Copper Porphyry SAG Mill & Flotation

Product family: 28% Cu Chalcopyrite Concentrate.

Flow: Open-Pit Blast Shovels → Gyratory Crush & Coarse Pile → SAG & Ball Mill Hydrocyclone → Rougher/Cleaner Froth Flot → High-Rate Thickener & Press → Filter Cake Rail Gondola → Global Copper Smelters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 60,000-TPD Copper Porphyry SAG Mill & FlotationSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Open-Pit Blast Shovels → Gyratory Crush & Coarse Pile (139 s) → SAG & Ball Mill Hydrocyclone (208 s) → Rougher/Cleaner Froth Flot (162 s) → High-Rate Thickener & Press (135 s) → Filter Cake Rail Gondola (108 s) → Global Copper Smelters.SUPPLIEROpen-Pit BlastShovelsI1.40 d1Gyratory Crush &Coarse PileC/T 139 sI2.20 d2SAG & Ball MillHydrocycloneC/T 208 sI1.60 d3Rougher/CleanerFroth FlotC/T 162 sI1.00 d4High-RateThickener & PressC/T 135 sI1.20 d5Filter Cake RailGondolaC/T 108 sI1.40 dCUSTOMERGlobal CopperSmelters420 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Gyratory Crush & Coarse Pile139 s10 min92%98.8%420588 (1.40 d)526
2. SAG & Ball Mill Hydrocyclone208 s35 min81%95.0%420924 (2.20 d)292
3. Rougher/Cleaner Froth Flot162 s20 min91%97.2%336672 (1.60 d)434
4. High-Rate Thickener & Press135 s10 min95%98.4%168420 (1.00 d)550
5. Filter Cake Rail Gondola108 s8 min97%99.4%168504 (1.20 d)712

Key figures

Takt time
193 s
Lead time
8.81 d
Value-added time
752 s
Process cycle efficiency (PCE)
0.11%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
420 tonnes
Line capacity per day
292 tonnes
Bottleneck
SAG & Ball Mill Hydrocyclone

Reading the bottleneck

The bottleneck is "SAG & Ball Mill Hydrocyclone": it can process 292 tonnes per day against a demand of 420 tonnes, so it falls short of demand by 30.5%. Once downtime and scrap are counted, its cycle time grows from 208 s to 270 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 81%), about 48.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.