Phosphate Ore Calcination, Scrub & Pipeline

Product family: Acid-Grade Phosphate Concentrate.

Flow: Surface Dragline Strip → Destone & Trommel Scrubbing → Attrition Scrubber & Cyclones → Reverse Amine Flotation → Fluidized Drying / Slurry Mix → 180km Hydraulic Slurry Pipe → Coastal Acid & NPK Complexes

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Phosphate Ore Calcination, Scrub & PipelineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Surface Dragline Strip → Destone & Trommel Scrubbing (86.0 s) → Attrition Scrubber & Cyclones (129 s) → Reverse Amine Flotation (100 s) → Fluidized Drying / Slurry Mix (83.0 s) → 180km Hydraulic Slurry Pipe (67.0 s) → Coastal Acid & NPK Complexes.SUPPLIERSurfaceDragline StripI1.40 d1Destone & TrommelScrubbingC/T 86.0 sI2.20 d2AttritionScrubber &…C/T 129 sI1.60 d3Reverse AmineFlotationC/T 100 sI1.00 d4Fluidized Drying/ Slurry MixC/T 83.0 sI1.20 d5180km HydraulicSlurry PipeC/T 67.0 sI1.40 dCUSTOMERCoastal Acid &NPK Complexes680 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Destone & Trommel Scrubbing86.0 s10 min92%98.8%680952 (1.40 d)850
2. Attrition Scrubber & Cyclones129 s35 min81%95.0%6801,496 (2.20 d)471
3. Reverse Amine Flotation100 s20 min91%97.2%5441,088 (1.60 d)703
4. Fluidized Drying / Slurry Mix83.0 s10 min95%98.4%272680 (1.00 d)895
5. 180km Hydraulic Slurry Pipe67.0 s8 min97%99.4%272816 (1.20 d)1,148

Key figures

Takt time
119 s
Lead time
8.81 d
Value-added time
465 s
Process cycle efficiency (PCE)
0.065%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
680 tonnes
Line capacity per day
471 tonnes
Bottleneck
Attrition Scrubber & Cyclones

Reading the bottleneck

The bottleneck is "Attrition Scrubber & Cyclones": it can process 471 tonnes per day against a demand of 680 tonnes, so it falls short of demand by 30.8%. Once downtime and scrap are counted, its cycle time grows from 129 s to 168 s, against a takt of 119 s. The largest loss at this step is equipment downtime (uptime 81%), about 30.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Mining, Quarries, Lithium & Refining: Mining, Quarries, Lithium & Refining