Automated Autonomous Drill-Blast-Load Mine Bench
Product family: Digital Fragmentation Control.
Flow: Emulsion Bulk Explosives → 3D Drone Bench Toe & Collar Map → Autonomous Rotary Blast Drill → Laser Borehole Void & Emulsion → Electronic Detonator Stemming → 3D Frag Camera & Shovel Load → Primary Crusher Dump
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 3D Drone Bench Toe & Collar Map | 1,215 s | 10 min | 92% | 98.8% | 32 | 45 (1.41 d) | 40 |
| 2. Autonomous Rotary Blast Drill | 1,823 s | 35 min | 81% | 95.0% | 32 | 70 (2.19 d) | 22 |
| 3. Laser Borehole Void & Emulsion | 1,418 s | 20 min | 91% | 97.2% | 26 | 51 (1.59 d) | 33 |
| 4. Electronic Detonator Stemming | 1,181 s | 10 min | 95% | 98.4% | 13 | 32 (1.00 d) | 42 |
| 5. 3D Frag Camera & Shovel Load | 945 s | 8 min | 97% | 99.4% | 13 | 38 (1.19 d) | 54 |
Key figures
- Takt time
- 1,688 s
- Lead time
- 8.90 d
- Value-added time
- 6,582 s
- Process cycle efficiency (PCE)
- 1.4%
- Rolled throughput yield (RTY)
- 89.2%
- Customer demand per day
- 32 batches
- Line capacity per day
- 22 batches
- Bottleneck
- Autonomous Rotary Blast Drill
Reading the bottleneck
The bottleneck is "Autonomous Rotary Blast Drill": it can process 22 batches per day against a demand of 32 batches, so it falls short of demand by 31.5%. Once downtime and scrap are counted, its cycle time grows from 1,823 s to 2,369 s, against a takt of 1,688 s. The largest loss at this step is equipment downtime (uptime 81%), about 428 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Mining, Quarries, Lithium & Refining: Mining, Quarries, Lithium & Refining
- Crushing, Screening & Bulk Rail Dispatch
- 60,000-TPD Copper Porphyry SAG Mill & Flotation
- Carbon-in-Leach (CIL) Gold Ore Extraction
- Phosphate Ore Calcination, Scrub & Pipeline
- Direct Lithium Extraction (DLE) & Li2CO3 Plant
- Magnetite Iron Ore Concentrator & Induration
- Caustic Bauxite Digestion to Smelter Alumina
- Exploration Diamond Core Logging & Fire-Assay Lab
- 240-Ton Electric Haul Truck 15,000-Hr Overhaul
- Granular Muriate of Potash (MOP) Compaction
- Solar Sea-Salt Wash, Vacuum Evaporate & Iodize