Automated Autonomous Drill-Blast-Load Mine Bench

Product family: Digital Fragmentation Control.

Flow: Emulsion Bulk Explosives → 3D Drone Bench Toe & Collar Map → Autonomous Rotary Blast Drill → Laser Borehole Void & Emulsion → Electronic Detonator Stemming → 3D Frag Camera & Shovel Load → Primary Crusher Dump

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Automated Autonomous Drill-Blast-Load Mine BenchSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Emulsion Bulk Explosives → 3D Drone Bench Toe & Collar Map (1,215 s) → Autonomous Rotary Blast Drill (1,823 s) → Laser Borehole Void & Emulsion (1,418 s) → Electronic Detonator Stemming (1,181 s) → 3D Frag Camera & Shovel Load (945 s) → Primary Crusher Dump.SUPPLIEREmulsion BulkExplosivesI1.41 d13D Drone BenchToe & Collar MapC/T 1,215 sI2.19 d2Autonomous RotaryBlast DrillC/T 1,823 sI1.59 d3Laser BoreholeVoid & EmulsionC/T 1,418 sI1.00 d4ElectronicDetonator…C/T 1,181 sI1.19 d53D Frag Camera &Shovel LoadC/T 945 sI1.41 dCUSTOMERPrimary CrusherDump32 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 3D Drone Bench Toe & Collar Map1,215 s10 min92%98.8%3245 (1.41 d)40
2. Autonomous Rotary Blast Drill1,823 s35 min81%95.0%3270 (2.19 d)22
3. Laser Borehole Void & Emulsion1,418 s20 min91%97.2%2651 (1.59 d)33
4. Electronic Detonator Stemming1,181 s10 min95%98.4%1332 (1.00 d)42
5. 3D Frag Camera & Shovel Load945 s8 min97%99.4%1338 (1.19 d)54

Key figures

Takt time
1,688 s
Lead time
8.90 d
Value-added time
6,582 s
Process cycle efficiency (PCE)
1.4%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
32 batches
Line capacity per day
22 batches
Bottleneck
Autonomous Rotary Blast Drill

Reading the bottleneck

The bottleneck is "Autonomous Rotary Blast Drill": it can process 22 batches per day against a demand of 32 batches, so it falls short of demand by 31.5%. Once downtime and scrap are counted, its cycle time grows from 1,823 s to 2,369 s, against a takt of 1,688 s. The largest loss at this step is equipment downtime (uptime 81%), about 428 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.