Carbon-in-Leach (CIL) Gold Ore Extraction
Product family: Dore Gold Bullion Bars.
Flow: Underground Stopes & Pit → Crush & Closed Ball Milling → Gravity Centrifugal Concentrator → Oxygenated Cyanide CIL Tanks → Elution Strip & Electrowin → Induction Smelt Dore Bullion → Precious Metal Refineries
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Crush & Closed Ball Milling | 686 s | 10 min | 92% | 98.8% | 85 | 119 (1.40 d) | 107 |
| 2. Gravity Centrifugal Concentrator | 1,029 s | 35 min | 81% | 95.0% | 85 | 187 (2.20 d) | 59 |
| 3. Oxygenated Cyanide CIL Tanks | 800 s | 20 min | 91% | 97.2% | 68 | 136 (1.60 d) | 88 |
| 4. Elution Strip & Electrowin | 667 s | 10 min | 95% | 98.4% | 34 | 85 (1.00 d) | 111 |
| 5. Induction Smelt Dore Bullion | 534 s | 8 min | 97% | 99.4% | 34 | 102 (1.20 d) | 144 |
Key figures
- Takt time
- 953 s
- Lead time
- 8.85 d
- Value-added time
- 3,716 s
- Process cycle efficiency (PCE)
- 0.52%
- Rolled throughput yield (RTY)
- 89.2%
- Customer demand per day
- 85 batches
- Line capacity per day
- 59 batches
- Bottleneck
- Gravity Centrifugal Concentrator
Reading the bottleneck
The bottleneck is "Gravity Centrifugal Concentrator": it can process 59 batches per day against a demand of 85 batches, so it falls short of demand by 30.6%. Once downtime and scrap are counted, its cycle time grows from 1,029 s to 1,337 s, against a takt of 953 s. The largest loss at this step is equipment downtime (uptime 81%), about 241 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Mining, Quarries, Lithium & Refining: Mining, Quarries, Lithium & Refining
- Crushing, Screening & Bulk Rail Dispatch
- 60,000-TPD Copper Porphyry SAG Mill & Flotation
- Phosphate Ore Calcination, Scrub & Pipeline
- Direct Lithium Extraction (DLE) & Li2CO3 Plant
- Magnetite Iron Ore Concentrator & Induration
- Caustic Bauxite Digestion to Smelter Alumina
- Exploration Diamond Core Logging & Fire-Assay Lab
- 240-Ton Electric Haul Truck 15,000-Hr Overhaul
- Automated Autonomous Drill-Blast-Load Mine Bench
- Granular Muriate of Potash (MOP) Compaction
- Solar Sea-Salt Wash, Vacuum Evaporate & Iodize