Carbon-in-Leach (CIL) Gold Ore Extraction

Product family: Dore Gold Bullion Bars.

Flow: Underground Stopes & Pit → Crush & Closed Ball Milling → Gravity Centrifugal Concentrator → Oxygenated Cyanide CIL Tanks → Elution Strip & Electrowin → Induction Smelt Dore Bullion → Precious Metal Refineries

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Carbon-in-Leach (CIL) Gold Ore ExtractionSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Underground Stopes & Pit → Crush & Closed Ball Milling (686 s) → Gravity Centrifugal Concentrator (1,029 s) → Oxygenated Cyanide CIL Tanks (800 s) → Elution Strip & Electrowin (667 s) → Induction Smelt Dore Bullion (534 s) → Precious Metal Refineries.SUPPLIERUndergroundStopes & PitI1.40 d1Crush & ClosedBall MillingC/T 686 sI2.20 d2GravityCentrifugal…C/T 1,029 sI1.60 d3OxygenatedCyanide CIL TanksC/T 800 sI1.00 d4Elution Strip &ElectrowinC/T 667 sI1.20 d5Induction SmeltDore BullionC/T 534 sI1.40 dCUSTOMERPrecious MetalRefineries85 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Crush & Closed Ball Milling686 s10 min92%98.8%85119 (1.40 d)107
2. Gravity Centrifugal Concentrator1,029 s35 min81%95.0%85187 (2.20 d)59
3. Oxygenated Cyanide CIL Tanks800 s20 min91%97.2%68136 (1.60 d)88
4. Elution Strip & Electrowin667 s10 min95%98.4%3485 (1.00 d)111
5. Induction Smelt Dore Bullion534 s8 min97%99.4%34102 (1.20 d)144

Key figures

Takt time
953 s
Lead time
8.85 d
Value-added time
3,716 s
Process cycle efficiency (PCE)
0.52%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
85 batches
Line capacity per day
59 batches
Bottleneck
Gravity Centrifugal Concentrator

Reading the bottleneck

The bottleneck is "Gravity Centrifugal Concentrator": it can process 59 batches per day against a demand of 85 batches, so it falls short of demand by 30.6%. Once downtime and scrap are counted, its cycle time grows from 1,029 s to 1,337 s, against a takt of 953 s. The largest loss at this step is equipment downtime (uptime 81%), about 241 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Mining, Quarries, Lithium & Refining: Mining, Quarries, Lithium & Refining