Oil, Gas, LNG & Refinery Turnarounds VSM Scenarios
12 scenarios of Oil, Gas, LNG & Refinery Turnarounds, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Crude Desalt / Gas Pre-Treat → Distillation / Cryo Cold Box → Hydrotreater / Compressor Overhaul → Sweetening & Spec Lab Release → Marine Jetty / Pipeline Custody. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| 150kbpd Crude Desalting & Atmospheric Topping | 140 batches per day | 3 | 579 s | 8.13 d | 0.34% | 50-Tray Atmospheric Column |
| Base-Load Mixed-Refrigerant LNG Liquefaction Train | 95 batches per day | 3 | 853 s | 8.16 d | 0.50% | Spiral-Wound Cryo Main Exch |
| 2,400-cph LPG Domestic Gas Cylinder Hydro & Fill | 14,000 units per day | 2 | 3.9 s | 8.10 d | 0.003% | Sniffer Gas Leak & Tare Check |
| Intelligent MFL Pipeline Inline Integrity Pigging | 4 cases per day | 1 | 6,750 s | 8.97 d | 10.8% | High-Res MFL & UT Smart Pig |
| Steam Naphtha/Ethane Cracker & Olefins Sep | 180 batches per day | 3 | 450 s | 8.12 d | 0.26% | 5-Stage Cracked Gas Compress |
| Airport Into-Plane Jet-A1 Fuel Farm Filtration | 240 batches per day | 3 | 338 s | 8.12 d | 0.20% | Conductivity & Microbiota QC |
| SBS Polymer-Modified Highway Bitumen Mill | 320 tonnes per day | 2 | 169 s | 8.11 d | 0.15% | Ductility & Softening Point QC |
| Hydrocracker 28-Day Refinery Major Turnaround | 12 cases per day | 3 | 6,750 s | 8.49 d | 3.8% | Bundle Pull, Hydro-Jet & NDT |
| 15,000-PSI Subsea / Onshore Christmas Tree Test | 6 units per day | 1 | 4,500 s | 8.81 d | 7.3% | Nitrogen PR2 Thermal Cycling |
| Centrifugal Sour Gas Pipeline Compressor Rebuild | 4 units per day | 2 | 13,500 s | 8.97 d | 10.8% | Tandem Dry-Gas Seal Fit |
| 300-Bar Fast-Fill CNG / Bio-CNG Fleet Station | 10 skids per day | 1 | 2,700 s | 8.49 d | 4.5% | 4-Stage Compressor Oil-Free |
| Claus Thermal Sulfur Recovery & Granulation | 180 tonnes per day | 3 | 450 s | 8.12 d | 0.26% | Liquid Sulfur Degassing Pit |