Intelligent MFL Pipeline Inline Integrity Pigging

Product family: 300km Transmission Inspection.

Flow: Smart MFL Inspection Pig OEMs → Geometric Caliper Run Gauge → Scraper Wax Cleaning Run → High-Res MFL & UT Smart Pig → Anomaly Corrosion Dig Fix → MAOP Pressure Fitness Cert → Oil & Gas Pipeline Operators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Intelligent MFL Pipeline Inline Integrity PiggingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Smart MFL Inspection Pig OEMs → Geometric Caliper Run Gauge (4,590 s) → Scraper Wax Cleaning Run (5,738 s) → High-Res MFL & UT Smart Pig (7,223 s) → Anomaly Corrosion Dig Fix (4,860 s) → MAOP Pressure Fitness Cert (3,645 s) → Oil & Gas Pipeline Operators.SUPPLIERSmart MFLInspection PigOEMsI1.25 d1Geometric CaliperRun GaugeC/T 4,590 sI1.50 d2Scraper WaxCleaning RunC/T 5,738 sI2.00 d3High-Res MFL & UTSmart PigC/T 7,223 sI1.00 d4Anomaly CorrosionDig FixC/T 4,860 sI0.75 d5MAOP PressureFitness CertC/T 3,645 sI1.50 dCUSTOMEROil & GasPipeline…4 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Geometric Caliper Run Gauge4,590 s20 min96%99.1%65 (1.25 d)5
2. Scraper Wax Cleaning Run5,738 s35 min93%98.4%66 (1.50 d)4
3. High-Res MFL & UT Smart Pig7,223 s45 min84%96.4%48 (2.00 d)3
4. Anomaly Corrosion Dig Fix4,860 s10 min96%98.8%24 (1.00 d)5
5. MAOP Pressure Fitness Cert3,645 s10 min98%99.5%13 (0.75 d)7

Key figures

Takt time
6,750 s
Lead time
8.97 d
Value-added time
26,056 s
Process cycle efficiency (PCE)
10.8%
Rolled throughput yield (RTY)
92.4%
Customer demand per day
4 cases
Line capacity per day
3 cases
Bottleneck
High-Res MFL & UT Smart Pig

Reading the bottleneck

The bottleneck is "High-Res MFL & UT Smart Pig": it can process 3 cases per day against a demand of 4 cases, so it falls short of demand by 31.9%. Once downtime and scrap are counted, its cycle time grows from 7,223 s to 8,920 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 84%), about 1,376 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.