300-Bar Fast-Fill CNG / Bio-CNG Fleet Station
Product family: Heavy Truck Gas Fueling Skids.
Flow: 4-Stage Recip Compressors → Stainless High-Pres Piping → Dryer Molecular Sieve Tower → 4-Stage Compressor Oil-Free → Dispenser Mass-Flow Calibrate → ATEX Zone-1 Soap & Gas Hold → Municipal Bus & Truck Depots
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Stainless High-Pres Piping | 1,836 s | 20 min | 96% | 99.1% | 15 | 13 (1.30 d) | 14 |
| 2. Dryer Molecular Sieve Tower | 2,295 s | 35 min | 93% | 98.4% | 15 | 14 (1.40 d) | 10 |
| 3. 4-Stage Compressor Oil-Free | 2,889 s | 45 min | 84% | 96.4% | 10 | 20 (2.00 d) | 7 |
| 4. Dispenser Mass-Flow Calibrate | 1,944 s | 10 min | 96% | 98.8% | 4 | 11 (1.10 d) | 12 |
| 5. ATEX Zone-1 Soap & Gas Hold | 1,458 s | 10 min | 98% | 99.5% | 3 | 8 (0.80 d) | 17 |
Key figures
- Takt time
- 2,700 s
- Lead time
- 8.49 d
- Value-added time
- 10,422 s
- Process cycle efficiency (PCE)
- 4.5%
- Rolled throughput yield (RTY)
- 92.4%
- Customer demand per day
- 10 skids
- Line capacity per day
- 7 skids
- Bottleneck
- 4-Stage Compressor Oil-Free
Reading the bottleneck
The bottleneck is "4-Stage Compressor Oil-Free": it can process 7 skids per day against a demand of 10 skids, so it falls short of demand by 31.9%. Once downtime and scrap are counted, its cycle time grows from 2,889 s to 3,568 s, against a takt of 2,700 s. The largest loss at this step is equipment downtime (uptime 84%), about 550 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Oil, Gas, LNG & Refinery Turnarounds: Oil, Gas, LNG & Refinery Turnarounds
- 150kbpd Crude Desalting & Atmospheric Topping
- Base-Load Mixed-Refrigerant LNG Liquefaction Train
- 2,400-cph LPG Domestic Gas Cylinder Hydro & Fill
- Intelligent MFL Pipeline Inline Integrity Pigging
- Steam Naphtha/Ethane Cracker & Olefins Sep
- Airport Into-Plane Jet-A1 Fuel Farm Filtration
- SBS Polymer-Modified Highway Bitumen Mill
- Hydrocracker 28-Day Refinery Major Turnaround
- 15,000-PSI Subsea / Onshore Christmas Tree Test
- Centrifugal Sour Gas Pipeline Compressor Rebuild
- Claus Thermal Sulfur Recovery & Granulation