Claus Thermal Sulfur Recovery & Granulation

Product family: 99.9% Elemental Sulfur Pastilles.

Flow: Refinery Acid H2S Gas → Claus Reaction Furnace Burn → 3-Stage Catalytic Converter → Liquid Sulfur Degassing Pit → Pastille Belt Solidifier → Dust-Free Bulk Rail Silo → Fertilizer Phosphate Acid Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Claus Thermal Sulfur Recovery & GranulationSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Refinery Acid H2S Gas → Claus Reaction Furnace Burn (306 s) → 3-Stage Catalytic Converter (383 s) → Liquid Sulfur Degassing Pit (482 s) → Pastille Belt Solidifier (324 s) → Dust-Free Bulk Rail Silo (243 s) → Fertilizer Phosphate Acid Plants.SUPPLIERRefinery AcidH2S GasI1.30 d1Claus ReactionFurnace BurnC/T 306 sI1.40 d23-Stage CatalyticConverterC/T 383 sI2.00 d3Liquid SulfurDegassing PitC/T 482 sI1.10 d4Pastille BeltSolidifierC/T 324 sI0.80 d5Dust-Free BulkRail SiloC/T 243 sI1.50 dCUSTOMERFertilizerPhosphate Acid…180 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Claus Reaction Furnace Burn306 s20 min96%99.1%270234 (1.30 d)249
2. 3-Stage Catalytic Converter383 s35 min93%98.4%270252 (1.40 d)190
3. Liquid Sulfur Degassing Pit482 s45 min84%96.4%180360 (2.00 d)132
4. Pastille Belt Solidifier324 s10 min96%98.8%72198 (1.10 d)233
5. Dust-Free Bulk Rail Silo243 s10 min98%99.5%45144 (0.80 d)315

Key figures

Takt time
450 s
Lead time
8.12 d
Value-added time
1,738 s
Process cycle efficiency (PCE)
0.26%
Rolled throughput yield (RTY)
92.4%
Customer demand per day
180 tonnes
Line capacity per day
132 tonnes
Bottleneck
Liquid Sulfur Degassing Pit

Reading the bottleneck

The bottleneck is "Liquid Sulfur Degassing Pit": it can process 132 tonnes per day against a demand of 180 tonnes, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 482 s to 595 s, against a takt of 450 s. The largest loss at this step is equipment downtime (uptime 84%), about 91.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.