Hydrocracker 28-Day Refinery Major Turnaround

Product family: Critical Path Heat-Exchanger Pull.

Flow: Contractor Riggers & Crane → Unit Feed Cut & Nitrogen Purge → Hydraulic Torque Blind LOTO → Bundle Pull, Hydro-Jet & NDT → Torque Box-Up & Helium Leak → Warm-Up & Catalyst Sulfiding → Refinery Plant Restart

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hydrocracker 28-Day Refinery Major TurnaroundSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Contractor Riggers & Crane → Unit Feed Cut & Nitrogen Purge (4,590 s) → Hydraulic Torque Blind LOTO (5,738 s) → Bundle Pull, Hydro-Jet & NDT (7,223 s) → Torque Box-Up & Helium Leak (4,860 s) → Warm-Up & Catalyst Sulfiding (3,645 s) → Refinery Plant Restart.SUPPLIERContractorRiggers & CraneI1.33 d1Unit Feed Cut &Nitrogen PurgeC/T 4,590 sI1.42 d2Hydraulic TorqueBlind LOTOC/T 5,738 sI2.00 d3Bundle Pull,Hydro-Jet & NDTC/T 7,223 sI1.08 d4Torque Box-Up &Helium LeakC/T 4,860 sI0.83 d5Warm-Up &Catalyst…C/T 3,645 sI1.50 dCUSTOMERRefinery PlantRestart12 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Unit Feed Cut & Nitrogen Purge4,590 s20 min96%99.1%1816 (1.33 d)17
2. Hydraulic Torque Blind LOTO5,738 s35 min93%98.4%1817 (1.42 d)13
3. Bundle Pull, Hydro-Jet & NDT7,223 s45 min84%96.4%1224 (2.00 d)9
4. Torque Box-Up & Helium Leak4,860 s10 min96%98.8%513 (1.08 d)16
5. Warm-Up & Catalyst Sulfiding3,645 s10 min98%99.5%310 (0.83 d)21

Key figures

Takt time
6,750 s
Lead time
8.49 d
Value-added time
26,056 s
Process cycle efficiency (PCE)
3.8%
Rolled throughput yield (RTY)
92.4%
Customer demand per day
12 cases
Line capacity per day
9 cases
Bottleneck
Bundle Pull, Hydro-Jet & NDT

Reading the bottleneck

The bottleneck is "Bundle Pull, Hydro-Jet & NDT": it can process 9 cases per day against a demand of 12 cases, so it falls short of demand by 26.8%. Once downtime and scrap are counted, its cycle time grows from 7,223 s to 8,920 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 84%), about 1,376 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.