Airport Into-Plane Jet-A1 Fuel Farm Filtration
Product family: Zero-Water EI-1581 Filtration.
Flow: Refinery Dedicated Pipeline → Settling Tank Free-Water Drain → Clay & Coalescer Filter Skid → Conductivity & Microbiota QC → Ring-Main Pressure Pump Loop → Hydrant Cart Aircraft Fueling → Airport Hydrant Refuelers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Settling Tank Free-Water Drain | 230 s | 20 min | 96% | 99.1% | 360 | 312 (1.30 d) | 332 |
| 2. Clay & Coalescer Filter Skid | 287 s | 35 min | 93% | 98.4% | 360 | 336 (1.40 d) | 254 |
| 3. Conductivity & Microbiota QC | 361 s | 45 min | 84% | 96.4% | 240 | 480 (2.00 d) | 176 |
| 4. Ring-Main Pressure Pump Loop | 243 s | 10 min | 96% | 98.8% | 96 | 264 (1.10 d) | 310 |
| 5. Hydrant Cart Aircraft Fueling | 182 s | 10 min | 98% | 99.5% | 60 | 192 (0.80 d) | 421 |
Key figures
- Takt time
- 338 s
- Lead time
- 8.12 d
- Value-added time
- 1,303 s
- Process cycle efficiency (PCE)
- 0.20%
- Rolled throughput yield (RTY)
- 92.4%
- Customer demand per day
- 240 batches
- Line capacity per day
- 176 batches
- Bottleneck
- Conductivity & Microbiota QC
Reading the bottleneck
The bottleneck is "Conductivity & Microbiota QC": it can process 176 batches per day against a demand of 240 batches, so it falls short of demand by 26.8%. Once downtime and scrap are counted, its cycle time grows from 361 s to 446 s, against a takt of 338 s. The largest loss at this step is equipment downtime (uptime 84%), about 68.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Oil, Gas, LNG & Refinery Turnarounds: Oil, Gas, LNG & Refinery Turnarounds
- 150kbpd Crude Desalting & Atmospheric Topping
- Base-Load Mixed-Refrigerant LNG Liquefaction Train
- 2,400-cph LPG Domestic Gas Cylinder Hydro & Fill
- Intelligent MFL Pipeline Inline Integrity Pigging
- Steam Naphtha/Ethane Cracker & Olefins Sep
- SBS Polymer-Modified Highway Bitumen Mill
- Hydrocracker 28-Day Refinery Major Turnaround
- 15,000-PSI Subsea / Onshore Christmas Tree Test
- Centrifugal Sour Gas Pipeline Compressor Rebuild
- 300-Bar Fast-Fill CNG / Bio-CNG Fleet Station
- Claus Thermal Sulfur Recovery & Granulation