Base-Load Mixed-Refrigerant LNG Liquefaction Train

Product family: -162°C Cryo Methane Gas Train.

Flow: Pipeline Feed Natural Gas → Amine CO2/H2S Acid Removal → Molecular Sieve Dry & Hg Trap → Spiral-Wound Cryo Main Exch → Nitrogen Flash Sub-Cooling → -162°C Tank & Loading Arm → LNG Membrane Tankers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Base-Load Mixed-Refrigerant LNG Liquefaction TrainSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pipeline Feed Natural Gas → Amine CO2/H2S Acid Removal (580 s) → Molecular Sieve Dry & Hg Trap (725 s) → Spiral-Wound Cryo Main Exch (912 s) → Nitrogen Flash Sub-Cooling (614 s) → -162°C Tank & Loading Arm (460 s) → LNG Membrane Tankers.SUPPLIERPipeline FeedNatural GasI1.31 d1Amine CO2/H2SAcid RemovalC/T 580 sI1.40 d2Molecular SieveDry & Hg TrapC/T 725 sI2.00 d3Spiral-Wound CryoMain ExchC/T 912 sI1.11 d4Nitrogen FlashSub-CoolingC/T 614 sI0.80 d5-162°C Tank &Loading ArmC/T 460 sI1.51 dCUSTOMERLNG MembraneTankers95 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Amine CO2/H2S Acid Removal580 s20 min96%99.1%143124 (1.31 d)132
2. Molecular Sieve Dry & Hg Trap725 s35 min93%98.4%143133 (1.40 d)100
3. Spiral-Wound Cryo Main Exch912 s45 min84%96.4%95190 (2.00 d)70
4. Nitrogen Flash Sub-Cooling614 s10 min96%98.8%38105 (1.11 d)123
5. -162°C Tank & Loading Arm460 s10 min98%99.5%2476 (0.80 d)167

Key figures

Takt time
853 s
Lead time
8.16 d
Value-added time
3,291 s
Process cycle efficiency (PCE)
0.50%
Rolled throughput yield (RTY)
92.4%
Customer demand per day
95 batches
Line capacity per day
70 batches
Bottleneck
Spiral-Wound Cryo Main Exch

Reading the bottleneck

The bottleneck is "Spiral-Wound Cryo Main Exch": it can process 70 batches per day against a demand of 95 batches, so it falls short of demand by 26.8%. Once downtime and scrap are counted, its cycle time grows from 912 s to 1,126 s, against a takt of 853 s. The largest loss at this step is equipment downtime (uptime 84%), about 174 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.