150kbpd Crude Desalting & Atmospheric Topping
Product family: Refinery Light-End Distillation.
Flow: Pipeline & VLCC Crude Tankers → Electrostatic 2-Stage Desalt → 360°C Fired Furnace Preheat → 50-Tray Atmospheric Column → Side-Stripper Kero & Diesel → Tank Farm Blend & Custody Lab → Reformer, FCC & Diesel Hydro
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Electrostatic 2-Stage Desalt | 393 s | 20 min | 96% | 99.1% | 210 | 182 (1.30 d) | 194 |
| 2. 360°C Fired Furnace Preheat | 492 s | 35 min | 93% | 98.4% | 210 | 196 (1.40 d) | 148 |
| 3. 50-Tray Atmospheric Column | 619 s | 45 min | 84% | 96.4% | 140 | 280 (2.00 d) | 102 |
| 4. Side-Stripper Kero & Diesel | 417 s | 10 min | 96% | 98.8% | 56 | 154 (1.10 d) | 181 |
| 5. Tank Farm Blend & Custody Lab | 312 s | 10 min | 98% | 99.5% | 35 | 112 (0.80 d) | 246 |
Key figures
- Takt time
- 579 s
- Lead time
- 8.13 d
- Value-added time
- 2,233 s
- Process cycle efficiency (PCE)
- 0.34%
- Rolled throughput yield (RTY)
- 92.4%
- Customer demand per day
- 140 batches
- Line capacity per day
- 102 batches
- Bottleneck
- 50-Tray Atmospheric Column
Reading the bottleneck
The bottleneck is "50-Tray Atmospheric Column": it can process 102 batches per day against a demand of 140 batches, so it falls short of demand by 26.8%. Once downtime and scrap are counted, its cycle time grows from 619 s to 764 s, against a takt of 579 s. The largest loss at this step is equipment downtime (uptime 84%), about 118 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Oil, Gas, LNG & Refinery Turnarounds: Oil, Gas, LNG & Refinery Turnarounds
- Base-Load Mixed-Refrigerant LNG Liquefaction Train
- 2,400-cph LPG Domestic Gas Cylinder Hydro & Fill
- Intelligent MFL Pipeline Inline Integrity Pigging
- Steam Naphtha/Ethane Cracker & Olefins Sep
- Airport Into-Plane Jet-A1 Fuel Farm Filtration
- SBS Polymer-Modified Highway Bitumen Mill
- Hydrocracker 28-Day Refinery Major Turnaround
- 15,000-PSI Subsea / Onshore Christmas Tree Test
- Centrifugal Sour Gas Pipeline Compressor Rebuild
- 300-Bar Fast-Fill CNG / Bio-CNG Fleet Station
- Claus Thermal Sulfur Recovery & Granulation