SBS Polymer-Modified Highway Bitumen Mill

Product family: High-Rut-Resistance Asphalt.

Flow: Vacuum Residue & SBS Polymer → High-Shear Colloid Mill → 6-Hour Cure Swelling Agitate → Ductility & Softening Point QC → Heated Stirred Holding Tank → Insulated Road Tanker Load → Motorway Asphalt Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: SBS Polymer-Modified Highway Bitumen MillSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Vacuum Residue & SBS Polymer → High-Shear Colloid Mill (115 s) → 6-Hour Cure Swelling Agitate (143 s) → Ductility & Softening Point QC (181 s) → Heated Stirred Holding Tank (122 s) → Insulated Road Tanker Load (91.0 s) → Motorway Asphalt Plants.SUPPLIERVacuum Residue& SBS PolymerI1.30 d1High-ShearColloid MillC/T 115 sI1.40 d26-Hour CureSwelling AgitateC/T 143 sI2.00 d3Ductility &Softening Point…C/T 181 sI1.10 d4Heated StirredHolding TankC/T 122 sI0.80 d5Insulated RoadTanker LoadC/T 91.0 sI1.50 dCUSTOMERMotorwayAsphalt Plants320 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. High-Shear Colloid Mill115 s20 min96%99.1%480416 (1.30 d)440
2. 6-Hour Cure Swelling Agitate143 s35 min93%98.4%480448 (1.40 d)337
3. Ductility & Softening Point QC181 s45 min84%96.4%320640 (2.00 d)230
4. Heated Stirred Holding Tank122 s10 min96%98.8%128352 (1.10 d)408
5. Insulated Road Tanker Load91.0 s10 min98%99.5%80256 (0.80 d)553

Key figures

Takt time
169 s
Lead time
8.11 d
Value-added time
652 s
Process cycle efficiency (PCE)
0.15%
Rolled throughput yield (RTY)
92.4%
Customer demand per day
320 tonnes
Line capacity per day
230 tonnes
Bottleneck
Ductility & Softening Point QC

Reading the bottleneck

The bottleneck is "Ductility & Softening Point QC": it can process 230 tonnes per day against a demand of 320 tonnes, so it falls short of demand by 28.3%. Once downtime and scrap are counted, its cycle time grows from 181 s to 224 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 84%), about 34.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.