15,000-PSI Subsea / Onshore Christmas Tree Test

Product family: API-6A High-Pressure Valves.

Flow: Forged F22 & Nickel-Alloy Clad → Nickel-Alloy 625 Ring Groove CNC → Master & Wing Gate Assembly → Nitrogen PR2 Thermal Cycling → 15k-PSI Hydro Shell Test → Offshore Transport Skid → Upstream Exploration Fields

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 15,000-PSI Subsea / Onshore Christmas Tree TestSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Forged F22 & Nickel-Alloy Clad → Nickel-Alloy 625 Ring Groove CNC (3,060 s) → Master & Wing Gate Assembly (3,825 s) → Nitrogen PR2 Thermal Cycling (4,815 s) → 15k-PSI Hydro Shell Test (3,240 s) → Offshore Transport Skid (2,430 s) → Upstream Exploration Fields.SUPPLIERForged F22 &Nickel-AlloyCladI1.33 d1Nickel-Alloy 625Ring Groove CNCC/T 3,060 sI1.33 d2Master & WingGate AssemblyC/T 3,825 sI2.00 d3Nitrogen PR2Thermal CyclingC/T 4,815 sI1.17 d415k-PSI HydroShell TestC/T 3,240 sI0.83 d5OffshoreTransport SkidC/T 2,430 sI1.50 dCUSTOMERUpstreamExploration…6 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Nickel-Alloy 625 Ring Groove CNC3,060 s20 min96%99.1%98 (1.33 d)8
2. Master & Wing Gate Assembly3,825 s35 min93%98.4%98 (1.33 d)6
3. Nitrogen PR2 Thermal Cycling4,815 s45 min84%96.4%612 (2.00 d)4
4. 15k-PSI Hydro Shell Test3,240 s10 min96%98.8%27 (1.17 d)7
5. Offshore Transport Skid2,430 s10 min98%99.5%25 (0.83 d)10

Key figures

Takt time
4,500 s
Lead time
8.81 d
Value-added time
17,370 s
Process cycle efficiency (PCE)
7.3%
Rolled throughput yield (RTY)
92.4%
Customer demand per day
6 units
Line capacity per day
4 units
Bottleneck
Nitrogen PR2 Thermal Cycling

Reading the bottleneck

The bottleneck is "Nitrogen PR2 Thermal Cycling": it can process 4 units per day against a demand of 6 units, so it falls short of demand by 31.9%. Once downtime and scrap are counted, its cycle time grows from 4,815 s to 5,946 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 917 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.