Steam Naphtha/Ethane Cracker & Olefins Sep

Product family: Polymer-Grade Ethylene Plant.

Flow: Refinery Naphtha & Ethane → 850°C Radiant Steam Cracking → Transfer-Line Quench & Scrub → 5-Stage Cracked Gas Compress → Cryo Demethanizer Fraction → 99.95% Ethylene Pipeline Out → HDPE / PP Polymer Units

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Steam Naphtha/Ethane Cracker & Olefins SepSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Refinery Naphtha & Ethane → 850°C Radiant Steam Cracking (306 s) → Transfer-Line Quench & Scrub (383 s) → 5-Stage Cracked Gas Compress (482 s) → Cryo Demethanizer Fraction (324 s) → 99.95% Ethylene Pipeline Out (243 s) → HDPE / PP Polymer Units.SUPPLIERRefineryNaphtha &EthaneI1.30 d1850°C RadiantSteam CrackingC/T 306 sI1.40 d2Transfer-LineQuench & ScrubC/T 383 sI2.00 d35-Stage CrackedGas CompressC/T 482 sI1.10 d4Cryo DemethanizerFractionC/T 324 sI0.80 d599.95% EthylenePipeline OutC/T 243 sI1.50 dCUSTOMERHDPE / PPPolymer Units180 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 850°C Radiant Steam Cracking306 s20 min96%99.1%270234 (1.30 d)249
2. Transfer-Line Quench & Scrub383 s35 min93%98.4%270252 (1.40 d)190
3. 5-Stage Cracked Gas Compress482 s45 min84%96.4%180360 (2.00 d)132
4. Cryo Demethanizer Fraction324 s10 min96%98.8%72198 (1.10 d)233
5. 99.95% Ethylene Pipeline Out243 s10 min98%99.5%45144 (0.80 d)315

Key figures

Takt time
450 s
Lead time
8.12 d
Value-added time
1,738 s
Process cycle efficiency (PCE)
0.26%
Rolled throughput yield (RTY)
92.4%
Customer demand per day
180 batches
Line capacity per day
132 batches
Bottleneck
5-Stage Cracked Gas Compress

Reading the bottleneck

The bottleneck is "5-Stage Cracked Gas Compress": it can process 132 batches per day against a demand of 180 batches, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 482 s to 595 s, against a takt of 450 s. The largest loss at this step is equipment downtime (uptime 84%), about 91.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Oil, Gas, LNG & Refinery Turnarounds: Oil, Gas, LNG & Refinery Turnarounds