Centrifugal Sour Gas Pipeline Compressor Rebuild

Product family: Dry-Gas Seal & Rotor Overhaul.

Flow: Dry Gas Seal OEMs → Bundle Pull & Grit Blast → Impeller FPI & Shaft Straight → Tandem Dry-Gas Seal Fit → API-617 High-Speed Balance → Mechanical Run-In Test Bench → Gas Transmission Stations

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Centrifugal Sour Gas Pipeline Compressor RebuildSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Dry Gas Seal OEMs → Bundle Pull & Grit Blast (9,180 s) → Impeller FPI & Shaft Straight (11,475 s) → Tandem Dry-Gas Seal Fit (14,445 s) → API-617 High-Speed Balance (9,720 s) → Mechanical Run-In Test Bench (7,290 s) → Gas Transmission Stations.SUPPLIERDry Gas SealOEMsI1.25 d1Bundle Pull &Grit BlastC/T 9,180 sI1.50 d2Impeller FPI &Shaft StraightC/T 11,475 sI2.00 d3Tandem Dry-GasSeal FitC/T 14,445 sI1.00 d4API-617High-Speed…C/T 9,720 sI0.75 d5Mechanical Run-InTest BenchC/T 7,290 sI1.50 dCUSTOMERGasTransmission…4 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Bundle Pull & Grit Blast9,180 s20 min96%99.1%65 (1.25 d)6
2. Impeller FPI & Shaft Straight11,475 s35 min93%98.4%66 (1.50 d)4
3. Tandem Dry-Gas Seal Fit14,445 s45 min84%96.4%48 (2.00 d)3
4. API-617 High-Speed Balance9,720 s10 min96%98.8%24 (1.00 d)5
5. Mechanical Run-In Test Bench7,290 s10 min98%99.5%13 (0.75 d)7

Key figures

Takt time
13,500 s
Lead time
8.97 d
Value-added time
52,110 s
Process cycle efficiency (PCE)
10.8%
Rolled throughput yield (RTY)
92.4%
Customer demand per day
4 units
Line capacity per day
3 units
Bottleneck
Tandem Dry-Gas Seal Fit

Reading the bottleneck

The bottleneck is "Tandem Dry-Gas Seal Fit": it can process 3 units per day against a demand of 4 units, so it falls short of demand by 28.1%. Once downtime and scrap are counted, its cycle time grows from 14,445 s to 17,839 s, against a takt of 13,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 2,751 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Oil, Gas, LNG & Refinery Turnarounds: Oil, Gas, LNG & Refinery Turnarounds