Water Desalination, Waste & Recycling MRF VSM Scenarios
12 scenarios of Water Desalination, Waste & Recycling MRF, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Raw Intake Screen / MRF Tip → Pre-Filter UF / Ballistic Sep → RO Membrane Desal / NIR Sorter → Remineralize / Bale Compactor → Potable Lab / Recycled Bale Out. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| 100,000m³/Day Seawater Reverse Osmosis Plant | 240 batches per day | 3 | 338 s | 6.82 d | 0.23% | 65-Bar Isobaric RO Trains |
| 50-Ton/Hr AI Robotic Municipal Recycling MRF | 380 tonnes per day | 2 | 142 s | 6.81 d | 0.15% | Optical NIR + AI Robot Pick |
| Municipal Membrane Bioreactor (MBR) Reuse Plant | 320 batches per day | 3 | 253 s | 6.81 d | 0.17% | Submerged MBR Vacuum Permeate |
| Industrial Zero-Liquid-Discharge (ZLD) Brine Plant | 65 batches per day | 3 | 1,246 s | 6.87 d | 0.84% | MVC Vapor Recompression Evap |
| 1150°C Rotary Kiln Hazardous Chemical Destruction | 90 tonnes per day | 3 | 900 s | 6.84 d | 0.61% | 1150°C Rotary Kiln & 2s After |
| Hot-Caustic PET Bottle-to-Bottle Wash Line | 110 tonnes per day | 3 | 736 s | 6.83 d | 0.50% | 85°C Caustic Friction Wash |
| Urban Water Main Acoustic Leak Locate & Repair | 24 cases per day | 1 | 1,125 s | 6.95 d | 2.3% | Valve Shutdown & Hydro-Excav |
| Thermal Hydrolysis Sludge-to-Biogas Dewater | 95 tonnes per day | 3 | 853 s | 6.85 d | 0.58% | Centrifuge Poly Dewater 32% |
| Red-Bag Hospital Bio-Waste Autoclave Shred Line | 48 tonnes per day | 2 | 1,125 s | 6.87 d | 1.1% | 138°C 40-Min Pathogen Hold |
| High-Pressure Hydro-Jetting Storm Drain Loop | 36 cases per day | 1 | 750 s | 6.91 d | 1.5% | Root-Cutting & Silt Vac Suction |
| End-of-Life Tire Recovered Carbon Black Pyrolysis | 45 tonnes per day | 3 | 1,800 s | 6.91 d | 1.2% | Syn-Gas Condense to Pyro-Oil |
| 18.2 MΩ-cm Semicon Ultrapure Water (UPW) Skid | 180 batches per day | 3 | 450 s | 6.82 d | 0.31% | CEDI Electrodeionization Skid |