Urban Water Main Acoustic Leak Locate & Repair

Product family: Non-Revenue Water Cut 35->12%.

Flow: AMI Night-Flow Telemetry → DMA Night-Flow Anomaly Flag → Acoustic Correlator Pinpoint → Valve Shutdown & Hydro-Excav → Stainless Clamp / Pipe Replace → Flush, Bacteriological & Seal → City Water Customers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Urban Water Main Acoustic Leak Locate & RepairSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. AMI Night-Flow Telemetry → DMA Night-Flow Anomaly Flag (720 s) → Acoustic Correlator Pinpoint (900 s) → Valve Shutdown & Hydro-Excav (1,204 s) → Stainless Clamp / Pipe Replace (810 s) → Flush, Bacteriological & Seal (608 s) → City Water Customers.SUPPLIERAMI Night-FlowTelemetryI1.21 d1DMA Night-FlowAnomaly FlagC/T 720 sI1.29 d2AcousticCorrelator…C/T 900 sI1.79 d3Valve Shutdown &Hydro-ExcavC/T 1,204 sI0.92 d4Stainless Clamp /Pipe ReplaceC/T 810 sI0.58 d5Flush,Bacteriological …C/T 608 sI1.00 dCUSTOMERCity WaterCustomers24 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. DMA Night-Flow Anomaly Flag720 s15 min95%98.5%1929 (1.21 d)34
2. Acoustic Correlator Pinpoint900 s20 min92%97.4%1431 (1.29 d)25
3. Valve Shutdown & Hydro-Excav1,204 s30 min84%95.8%1943 (1.79 d)17
4. Stainless Clamp / Pipe Replace810 s10 min95%98.8%1022 (0.92 d)30
5. Flush, Bacteriological & Seal608 s8 min97%99.4%614 (0.58 d)40

Key figures

Takt time
1,125 s
Lead time
6.95 d
Value-added time
4,242 s
Process cycle efficiency (PCE)
2.3%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
24 cases
Line capacity per day
17 cases
Bottleneck
Valve Shutdown & Hydro-Excav

Reading the bottleneck

The bottleneck is "Valve Shutdown & Hydro-Excav": it can process 17 cases per day against a demand of 24 cases, so it falls short of demand by 31.1%. Once downtime and scrap are counted, its cycle time grows from 1,204 s to 1,496 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 84%), about 229 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.