End-of-Life Tire Recovered Carbon Black Pyrolysis

Product family: rCB & Circular Pyro-Oil.

Flow: Shredded Scrap OTR/Car Tires → De-Bead & Cryo Chip Prep → 480°C Oxygen-Free Rotary Kiln → Syn-Gas Condense to Pyro-Oil → Jet-Mill rCB Carbon Activation → Pelletize & Bulk Super-Sack → Tire & Rubber Compounders

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: End-of-Life Tire Recovered Carbon Black PyrolysisSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Shredded Scrap OTR/Car Tires → De-Bead & Cryo Chip Prep (1,152 s) → 480°C Oxygen-Free Rotary Kiln (1,440 s) → Syn-Gas Condense to Pyro-Oil (1,926 s) → Jet-Mill rCB Carbon Activation (1,296 s) → Pelletize & Bulk Super-Sack (972 s) → Tire & Rubber Compounders.SUPPLIERShredded ScrapOTR/Car TiresI1.20 d1De-Bead & CryoChip PrepC/T 1,152 sI1.31 d2480°C Oxygen-FreeRotary KilnC/T 1,440 sI1.80 d3Syn-Gas Condenseto Pyro-OilC/T 1,926 sI0.91 d4Jet-Mill rCBCarbon ActivationC/T 1,296 sI0.60 d5Pelletize & BulkSuper-SackC/T 972 sI1.00 dCUSTOMERTire & RubberCompounders45 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. De-Bead & Cryo Chip Prep1,152 s15 min95%98.5%3654 (1.20 d)65
2. 480°C Oxygen-Free Rotary Kiln1,440 s20 min92%97.4%2759 (1.31 d)49
3. Syn-Gas Condense to Pyro-Oil1,926 s30 min84%95.8%3681 (1.80 d)33
4. Jet-Mill rCB Carbon Activation1,296 s10 min95%98.8%1841 (0.91 d)58
5. Pelletize & Bulk Super-Sack972 s8 min97%99.4%1127 (0.60 d)78

Key figures

Takt time
1,800 s
Lead time
6.91 d
Value-added time
6,786 s
Process cycle efficiency (PCE)
1.2%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
45 tonnes
Line capacity per day
33 tonnes
Bottleneck
Syn-Gas Condense to Pyro-Oil

Reading the bottleneck

The bottleneck is "Syn-Gas Condense to Pyro-Oil": it can process 33 tonnes per day against a demand of 45 tonnes, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 1,926 s to 2,393 s, against a takt of 1,800 s. The largest loss at this step is equipment downtime (uptime 84%), about 367 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.