Red-Bag Hospital Bio-Waste Autoclave Shred Line
Product family: Zero-Pathogen Hospital Disposal.
Flow: Regional Clinics & Hospitals → Barcode Bin Manifest Weigh → Pre-Shred Vacuum Steam Chamber → 138°C 40-Min Pathogen Hold → Dewater Compaction Extrude → Daily Geobacillus Spore QC → Municipal Clean Landfill
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Barcode Bin Manifest Weigh | 720 s | 15 min | 95% | 98.5% | 38 | 58 (1.21 d) | 69 |
| 2. Pre-Shred Vacuum Steam Chamber | 900 s | 20 min | 92% | 97.4% | 29 | 62 (1.29 d) | 52 |
| 3. 138°C 40-Min Pathogen Hold | 1,204 s | 30 min | 84% | 95.8% | 38 | 86 (1.79 d) | 35 |
| 4. Dewater Compaction Extrude | 810 s | 10 min | 95% | 98.8% | 19 | 43 (0.90 d) | 61 |
| 5. Daily Geobacillus Spore QC | 608 s | 8 min | 97% | 99.4% | 12 | 29 (0.60 d) | 83 |
Key figures
- Takt time
- 1,125 s
- Lead time
- 6.87 d
- Value-added time
- 4,242 s
- Process cycle efficiency (PCE)
- 1.1%
- Rolled throughput yield (RTY)
- 90.3%
- Customer demand per day
- 48 tonnes
- Line capacity per day
- 35 tonnes
- Bottleneck
- 138°C 40-Min Pathogen Hold
Reading the bottleneck
The bottleneck is "138°C 40-Min Pathogen Hold": it can process 35 tonnes per day against a demand of 48 tonnes, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 1,204 s to 1,496 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 84%), about 229 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Water Desalination, Waste & Recycling MRF: Water Desalination, Waste & Recycling MRF
- 100,000m³/Day Seawater Reverse Osmosis Plant
- 50-Ton/Hr AI Robotic Municipal Recycling MRF
- Municipal Membrane Bioreactor (MBR) Reuse Plant
- Industrial Zero-Liquid-Discharge (ZLD) Brine Plant
- 1150°C Rotary Kiln Hazardous Chemical Destruction
- Hot-Caustic PET Bottle-to-Bottle Wash Line
- Urban Water Main Acoustic Leak Locate & Repair
- Thermal Hydrolysis Sludge-to-Biogas Dewater
- High-Pressure Hydro-Jetting Storm Drain Loop
- End-of-Life Tire Recovered Carbon Black Pyrolysis
- 18.2 MΩ-cm Semicon Ultrapure Water (UPW) Skid