Industrial Zero-Liquid-Discharge (ZLD) Brine Plant

Product family: 99% Pure Salt Recovery Loop.

Flow: Textile & Chemical RO Reject → Lime-Soda Silica Softening → High-Pressure Brine Concent → MVC Vapor Recompression Evap → Centrifuge Mixed Salt Cake → Distillate Return to Boilers → Industrial Eco-Parks

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Industrial Zero-Liquid-Discharge (ZLD) Brine PlantSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Textile & Chemical RO Reject → Lime-Soda Silica Softening (798 s) → High-Pressure Brine Concent (997 s) → MVC Vapor Recompression Evap (1,333 s) → Centrifuge Mixed Salt Cake (897 s) → Distillate Return to Boilers (673 s) → Industrial Eco-Parks.SUPPLIERTextile &Chemical RORejectI1.20 d1Lime-Soda SilicaSofteningC/T 798 sI1.31 d2High-PressureBrine ConcentC/T 997 sI1.80 d3MVC VaporRecompression…C/T 1,333 sI0.91 d4Centrifuge MixedSalt CakeC/T 897 sI0.60 d5Distillate Returnto BoilersC/T 673 sI1.00 dCUSTOMERIndustrialEco-Parks65 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Lime-Soda Silica Softening798 s15 min95%98.5%5278 (1.20 d)94
2. High-Pressure Brine Concent997 s20 min92%97.4%3985 (1.31 d)71
3. MVC Vapor Recompression Evap1,333 s30 min84%95.8%52117 (1.80 d)48
4. Centrifuge Mixed Salt Cake897 s10 min95%98.8%2659 (0.91 d)83
5. Distillate Return to Boilers673 s8 min97%99.4%1639 (0.60 d)113

Key figures

Takt time
1,246 s
Lead time
6.87 d
Value-added time
4,698 s
Process cycle efficiency (PCE)
0.84%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
65 batches
Line capacity per day
48 batches
Bottleneck
MVC Vapor Recompression Evap

Reading the bottleneck

The bottleneck is "MVC Vapor Recompression Evap": it can process 48 batches per day against a demand of 65 batches, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 1,333 s to 1,656 s, against a takt of 1,246 s. The largest loss at this step is equipment downtime (uptime 84%), about 254 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.