100,000m³/Day Seawater Reverse Osmosis Plant

Product family: Energy-Recovered Desalination.

Flow: Subsea Intake & Energy-Recovery Pumps → Dissolved Air Flotation DAF → Dual-Media & Cartridge 5um → 65-Bar Isobaric RO Trains → Limestone Remineralization → Potable Boron & Cl2 Release → Coastal Municipal Water

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 100,000m³/Day Seawater Reverse Osmosis PlantSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Subsea Intake & Energy-Recovery Pumps → Dissolved Air Flotation DAF (216 s) → Dual-Media & Cartridge 5um (270 s) → 65-Bar Isobaric RO Trains (361 s) → Limestone Remineralization (243 s) → Potable Boron & Cl2 Release (182 s) → Coastal Municipal Water.SUPPLIERSubsea Intake &Energy-RecoveryPumpsI1.20 d1Dissolved AirFlotation DAFC/T 216 sI1.30 d2Dual-Media &Cartridge 5umC/T 270 sI1.80 d365-Bar IsobaricRO TrainsC/T 361 sI0.90 d4LimestoneRemineralizationC/T 243 sI0.60 d5Potable Boron &Cl2 ReleaseC/T 182 sI1.00 dCUSTOMERCoastalMunicipal Water240 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Dissolved Air Flotation DAF216 s15 min95%98.5%192288 (1.20 d)346
2. Dual-Media & Cartridge 5um270 s20 min92%97.4%144312 (1.30 d)262
3. 65-Bar Isobaric RO Trains361 s30 min84%95.8%192432 (1.80 d)176
4. Limestone Remineralization243 s10 min95%98.8%96216 (0.90 d)307
5. Potable Boron & Cl2 Release182 s8 min97%99.4%60144 (0.60 d)419

Key figures

Takt time
338 s
Lead time
6.82 d
Value-added time
1,272 s
Process cycle efficiency (PCE)
0.23%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
240 batches
Line capacity per day
176 batches
Bottleneck
65-Bar Isobaric RO Trains

Reading the bottleneck

The bottleneck is "65-Bar Isobaric RO Trains": it can process 176 batches per day against a demand of 240 batches, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 361 s to 449 s, against a takt of 338 s. The largest loss at this step is equipment downtime (uptime 84%), about 68.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.