Municipal Membrane Bioreactor (MBR) Reuse Plant
Product family: Toilet-to-Irrigation Water Loop.
Flow: Municipal Sewer Trunk Feeds → Fine 2mm Drum Screen & Grit → Anoxic/Aerobic Nitrification → Submerged MBR Vacuum Permeate → UV-AOP Micro-Pollutant Kill → Turbidity <0.2 NTU Release → Park & Industrial Reuse
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Fine 2mm Drum Screen & Grit | 162 s | 15 min | 95% | 98.5% | 256 | 384 (1.20 d) | 461 |
| 2. Anoxic/Aerobic Nitrification | 203 s | 20 min | 92% | 97.4% | 192 | 416 (1.30 d) | 349 |
| 3. Submerged MBR Vacuum Permeate | 271 s | 30 min | 84% | 95.8% | 256 | 576 (1.80 d) | 234 |
| 4. UV-AOP Micro-Pollutant Kill | 182 s | 10 min | 95% | 98.8% | 128 | 288 (0.90 d) | 410 |
| 5. Turbidity <0.2 NTU Release | 137 s | 8 min | 97% | 99.4% | 80 | 192 (0.60 d) | 557 |
Key figures
- Takt time
- 253 s
- Lead time
- 6.81 d
- Value-added time
- 955 s
- Process cycle efficiency (PCE)
- 0.17%
- Rolled throughput yield (RTY)
- 90.3%
- Customer demand per day
- 320 batches
- Line capacity per day
- 234 batches
- Bottleneck
- Submerged MBR Vacuum Permeate
Reading the bottleneck
The bottleneck is "Submerged MBR Vacuum Permeate": it can process 234 batches per day against a demand of 320 batches, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 271 s to 337 s, against a takt of 253 s. The largest loss at this step is equipment downtime (uptime 84%), about 51.6 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Water Desalination, Waste & Recycling MRF: Water Desalination, Waste & Recycling MRF
- 100,000m³/Day Seawater Reverse Osmosis Plant
- 50-Ton/Hr AI Robotic Municipal Recycling MRF
- Industrial Zero-Liquid-Discharge (ZLD) Brine Plant
- 1150°C Rotary Kiln Hazardous Chemical Destruction
- Hot-Caustic PET Bottle-to-Bottle Wash Line
- Urban Water Main Acoustic Leak Locate & Repair
- Thermal Hydrolysis Sludge-to-Biogas Dewater
- Red-Bag Hospital Bio-Waste Autoclave Shred Line
- High-Pressure Hydro-Jetting Storm Drain Loop
- End-of-Life Tire Recovered Carbon Black Pyrolysis
- 18.2 MΩ-cm Semicon Ultrapure Water (UPW) Skid