High-Pressure Hydro-Jetting Storm Drain Loop

Product family: Pre-Monsoon Flood Prevention.

Flow: Municipal GIS Manhole Map → GIS Priority Flood Corridor → Jetter Truck Nozzle Blast → Root-Cutting & Silt Vac Suction → CCTV Pipe Crack Inspection → Dewatered Grit Yard Tip → Municipal Road Drainage

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Pressure Hydro-Jetting Storm Drain LoopSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Municipal GIS Manhole Map → GIS Priority Flood Corridor (480 s) → Jetter Truck Nozzle Blast (600 s) → Root-Cutting & Silt Vac Suction (803 s) → CCTV Pipe Crack Inspection (540 s) → Dewatered Grit Yard Tip (405 s) → Municipal Road Drainage.SUPPLIERMunicipal GISManhole MapI1.19 d1GIS PriorityFlood CorridorC/T 480 sI1.31 d2Jetter TruckNozzle BlastC/T 600 sI1.81 d3Root-Cutting &Silt Vac SuctionC/T 803 sI0.89 d4CCTV Pipe CrackInspectionC/T 540 sI0.61 d5Dewatered GritYard TipC/T 405 sI1.00 dCUSTOMERMunicipal RoadDrainage36 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. GIS Priority Flood Corridor480 s15 min95%98.5%2943 (1.19 d)50
2. Jetter Truck Nozzle Blast600 s20 min92%97.4%2247 (1.31 d)37
3. Root-Cutting & Silt Vac Suction803 s30 min84%95.8%2965 (1.81 d)25
4. CCTV Pipe Crack Inspection540 s10 min95%98.8%1432 (0.89 d)44
5. Dewatered Grit Yard Tip405 s8 min97%99.4%922 (0.61 d)60

Key figures

Takt time
750 s
Lead time
6.91 d
Value-added time
2,828 s
Process cycle efficiency (PCE)
1.5%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
36 cases
Line capacity per day
25 cases
Bottleneck
Root-Cutting & Silt Vac Suction

Reading the bottleneck

The bottleneck is "Root-Cutting & Silt Vac Suction": it can process 25 cases per day against a demand of 36 cases, so it falls short of demand by 31.1%. Once downtime and scrap are counted, its cycle time grows from 803 s to 998 s, against a takt of 750 s. The largest loss at this step is equipment downtime (uptime 84%), about 153 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.