Thermal Hydrolysis Sludge-to-Biogas Dewater

Product family: Class-A Biosolids & Power.

Flow: Wastewater Primary Sludge → 165°C Thermal Hydrolysis → High-Load Mesophilic Digest → Centrifuge Poly Dewater 32% → Gas Siloxane Scrub to CHP → Grade-A Odorless Soil Pellets → CHP Gas Engines & Ag Soil

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Thermal Hydrolysis Sludge-to-Biogas DewaterSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Wastewater Primary Sludge → 165°C Thermal Hydrolysis (546 s) → High-Load Mesophilic Digest (682 s) → Centrifuge Poly Dewater 32% (912 s) → Gas Siloxane Scrub to CHP (614 s) → Grade-A Odorless Soil Pellets (460 s) → CHP Gas Engines & Ag Soil.SUPPLIERWastewaterPrimary SludgeI1.20 d1165°C ThermalHydrolysisC/T 546 sI1.31 d2High-LoadMesophilic DigestC/T 682 sI1.80 d3Centrifuge PolyDewater 32%C/T 912 sI0.91 d4Gas SiloxaneScrub to CHPC/T 614 sI0.60 d5Grade-A OdorlessSoil PelletsC/T 460 sI1.00 dCUSTOMERCHP Gas Engines& Ag Soil95 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 165°C Thermal Hydrolysis546 s15 min95%98.5%76114 (1.20 d)137
2. High-Load Mesophilic Digest682 s20 min92%97.4%57124 (1.31 d)104
3. Centrifuge Poly Dewater 32%912 s30 min84%95.8%76171 (1.80 d)69
4. Gas Siloxane Scrub to CHP614 s10 min95%98.8%3886 (0.91 d)122
5. Grade-A Odorless Soil Pellets460 s8 min97%99.4%2457 (0.60 d)166

Key figures

Takt time
853 s
Lead time
6.85 d
Value-added time
3,214 s
Process cycle efficiency (PCE)
0.58%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
95 tonnes
Line capacity per day
69 tonnes
Bottleneck
Centrifuge Poly Dewater 32%

Reading the bottleneck

The bottleneck is "Centrifuge Poly Dewater 32%": it can process 69 tonnes per day against a demand of 95 tonnes, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 912 s to 1,133 s, against a takt of 853 s. The largest loss at this step is equipment downtime (uptime 84%), about 174 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.