Thermal Hydrolysis Sludge-to-Biogas Dewater
Product family: Class-A Biosolids & Power.
Flow: Wastewater Primary Sludge → 165°C Thermal Hydrolysis → High-Load Mesophilic Digest → Centrifuge Poly Dewater 32% → Gas Siloxane Scrub to CHP → Grade-A Odorless Soil Pellets → CHP Gas Engines & Ag Soil
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 165°C Thermal Hydrolysis | 546 s | 15 min | 95% | 98.5% | 76 | 114 (1.20 d) | 137 |
| 2. High-Load Mesophilic Digest | 682 s | 20 min | 92% | 97.4% | 57 | 124 (1.31 d) | 104 |
| 3. Centrifuge Poly Dewater 32% | 912 s | 30 min | 84% | 95.8% | 76 | 171 (1.80 d) | 69 |
| 4. Gas Siloxane Scrub to CHP | 614 s | 10 min | 95% | 98.8% | 38 | 86 (0.91 d) | 122 |
| 5. Grade-A Odorless Soil Pellets | 460 s | 8 min | 97% | 99.4% | 24 | 57 (0.60 d) | 166 |
Key figures
- Takt time
- 853 s
- Lead time
- 6.85 d
- Value-added time
- 3,214 s
- Process cycle efficiency (PCE)
- 0.58%
- Rolled throughput yield (RTY)
- 90.3%
- Customer demand per day
- 95 tonnes
- Line capacity per day
- 69 tonnes
- Bottleneck
- Centrifuge Poly Dewater 32%
Reading the bottleneck
The bottleneck is "Centrifuge Poly Dewater 32%": it can process 69 tonnes per day against a demand of 95 tonnes, so it falls short of demand by 26.9%. Once downtime and scrap are counted, its cycle time grows from 912 s to 1,133 s, against a takt of 853 s. The largest loss at this step is equipment downtime (uptime 84%), about 174 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Water Desalination, Waste & Recycling MRF: Water Desalination, Waste & Recycling MRF
- 100,000m³/Day Seawater Reverse Osmosis Plant
- 50-Ton/Hr AI Robotic Municipal Recycling MRF
- Municipal Membrane Bioreactor (MBR) Reuse Plant
- Industrial Zero-Liquid-Discharge (ZLD) Brine Plant
- 1150°C Rotary Kiln Hazardous Chemical Destruction
- Hot-Caustic PET Bottle-to-Bottle Wash Line
- Urban Water Main Acoustic Leak Locate & Repair
- Red-Bag Hospital Bio-Waste Autoclave Shred Line
- High-Pressure Hydro-Jetting Storm Drain Loop
- End-of-Life Tire Recovered Carbon Black Pyrolysis
- 18.2 MΩ-cm Semicon Ultrapure Water (UPW) Skid