18.2 MΩ-cm Semicon Ultrapure Water (UPW) Skid

Product family: Sub-PPT TOC Cleanroom Water.

Flow: Municipal Feed + Chemicals → Double-Pass RO + Degasser → 185nm UV TOC Oxidizer → CEDI Electrodeionization Skid → 0.02um Sub-Nanometer Ultrafilt → Online PPT Particle/Silica QC → 300mm Wafer Fabs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 18.2 MΩ-cm Semicon Ultrapure Water (UPW) SkidSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Municipal Feed + Chemicals → Double-Pass RO + Degasser (288 s) → 185nm UV TOC Oxidizer (360 s) → CEDI Electrodeionization Skid (482 s) → 0.02um Sub-Nanometer Ultrafilt (324 s) → Online PPT Particle/Silica QC (243 s) → 300mm Wafer Fabs.SUPPLIERMunicipal Feed+ ChemicalsI1.20 d1Double-Pass RO +DegasserC/T 288 sI1.30 d2185nm UV TOCOxidizerC/T 360 sI1.80 d3CEDIElectrodeionizat…C/T 482 sI0.90 d40.02umSub-Nanometer…C/T 324 sI0.60 d5Online PPTParticle/Silica…C/T 243 sI1.00 dCUSTOMER300mm WaferFabs180 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Double-Pass RO + Degasser288 s15 min95%98.5%144216 (1.20 d)260
2. 185nm UV TOC Oxidizer360 s20 min92%97.4%108234 (1.30 d)197
3. CEDI Electrodeionization Skid482 s30 min84%95.8%144324 (1.80 d)131
4. 0.02um Sub-Nanometer Ultrafilt324 s10 min95%98.8%72162 (0.90 d)230
5. Online PPT Particle/Silica QC243 s8 min97%99.4%45108 (0.60 d)314

Key figures

Takt time
450 s
Lead time
6.82 d
Value-added time
1,697 s
Process cycle efficiency (PCE)
0.31%
Rolled throughput yield (RTY)
90.3%
Customer demand per day
180 batches
Line capacity per day
131 batches
Bottleneck
CEDI Electrodeionization Skid

Reading the bottleneck

The bottleneck is "CEDI Electrodeionization Skid": it can process 131 batches per day against a demand of 180 batches, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 482 s to 599 s, against a takt of 450 s. The largest loss at this step is equipment downtime (uptime 84%), about 91.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.