Hospital Pharmacy & CSSD Sterilization VSM Scenarios

12 scenarios of Hospital Pharmacy & CSSD Sterilization, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Rx / Dirty Instrument Receipt → Thermal Washer / Dose Pick → Cleanroom Compounding / Autoclave → Pharmacist / BI Sterility QC → ADC Automated Ward Restock. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
Hospital ISO-5 Oncology IV Chemo Compounding140 packs per day1193 s5.03 d0.54%Robotic / Pharmacist Iso Mix
Hospital Central Sterile (CSSD) Instrument Loop280 crates per day2193 s5.01 d0.27%Optical Loupe Assemble & Count
Automated High-Bay Mail-Order Chronic Pharmacy8,500 orders per day26.4 s5.00 d0.009%Clinical Pharmacist Screen
Neonatal ICU Parenteral Nutrition (TPN) Compounding95 packs per day1284 s5.06 d0.79%Filter Integrity & Visual Scan
PET/SPECT Radiopharmacy Morning Dose Draw Hub360 vials per day175.0 s5.01 d0.21%Dose Calibrator Decay Draw
Long-Term Care 7-Day Multi-Med Pouches2,400 packs per day222.5 s5.00 d0.032%Optical Camera Pill-Count QC
Hospital Automated Ward Cabinet Restock4,200 vials per day212.9 s5.00 d0.018%Controlled Substance Audit
Outpatient Antibiotic OPAT & Biologic Pump Kit180 packs per day1150 s5.02 d0.42%Cold Pack Ancillary Supplies
EU-GMP Standardized Medical Cannabis Drying & Dose4,800 packs per day211.3 s5.00 d0.016%Electron-Beam Microbial Kill
Veterinary Flavor-Chew & Equine Rx Compounding450 orders per day160.0 s5.01 d0.17%Precision Weight Split Caps
Global Clinical Trial Drug Depot Temperature Pick240 crates per day1113 s5.02 d0.32%Qualified Cold Box Load
Multi-Chair Dental Clinic Cassette Sterilization95 crates per day1284 s5.06 d0.79%Wrapped Color Cassette Seal