EU-GMP Standardized Medical Cannabis Drying & Dose
Product family: Irradiated Exact-THC Flower.
Flow: Indoor Hydroponic Grow Rooms → Slow 14-Day Dehum Cure Hang → Cryo Trim & Terpene Preserve → Electron-Beam Microbial Kill → HPLC Potency & Mycotoxin QC → Tamper Jar & Pharmacy Track → Licensed Medical Pharmacies
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Slow 14-Day Dehum Cure Hang | 7.4 s | 10 min | 96% | 97.8% | 1,920 | 3,840 (0.80 d) | 6,661 |
| 2. Cryo Trim & Terpene Preserve | 9.2 s | 15 min | 93% | 98.2% | 1,920 | 5,280 (1.10 d) | 5,137 |
| 3. Electron-Beam Microbial Kill | 12.0 s | 25 min | 85% | 95.8% | 2,400 | 7,200 (1.50 d) | 3,461 |
| 4. HPLC Potency & Mycotoxin QC | 8.1 s | 6 min | 96% | 99.1% | 960 | 2,880 (0.60 d) | 6,131 |
| 5. Tamper Jar & Pharmacy Track | 6.1 s | 5 min | 98% | 99.5% | 960 | 2,400 (0.50 d) | 8,392 |
Key figures
- Takt time
- 11.3 s
- Lead time
- 5.00 d
- Value-added time
- 42.8 s
- Process cycle efficiency (PCE)
- 0.016%
- Rolled throughput yield (RTY)
- 90.7%
- Customer demand per day
- 4,800 packs
- Line capacity per day
- 3,461 packs
- Bottleneck
- Electron-Beam Microbial Kill
Reading the bottleneck
The bottleneck is "Electron-Beam Microbial Kill": it can process 3,461 packs per day against a demand of 4,800 packs, so it falls short of demand by 27.9%. Once downtime and scrap are counted, its cycle time grows from 12.0 s to 14.7 s, against a takt of 11.3 s. The largest loss at this step is equipment downtime (uptime 85%), about 2.1 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hospital Pharmacy & CSSD Sterilization: Hospital Pharmacy & CSSD Sterilization
- Hospital ISO-5 Oncology IV Chemo Compounding
- Hospital Central Sterile (CSSD) Instrument Loop
- Automated High-Bay Mail-Order Chronic Pharmacy
- Neonatal ICU Parenteral Nutrition (TPN) Compounding
- PET/SPECT Radiopharmacy Morning Dose Draw Hub
- Long-Term Care 7-Day Multi-Med Pouches
- Hospital Automated Ward Cabinet Restock
- Outpatient Antibiotic OPAT & Biologic Pump Kit
- Veterinary Flavor-Chew & Equine Rx Compounding
- Global Clinical Trial Drug Depot Temperature Pick
- Multi-Chair Dental Clinic Cassette Sterilization