Neonatal ICU Parenteral Nutrition (TPN) Compounding

Product family: Custom Multi-Chamber Amino Bags.

Flow: Parenteral Amino, Lipid & Trace Elements → Dietitian Electrolyte Check → 12-Channel Gravimetric Fill → Filter Integrity & Visual Scan → Light-Protective Amber Cover → Refrigerated NICU Stat Drop → NICU & ICU Beds

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Neonatal ICU Parenteral Nutrition (TPN) CompoundingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Parenteral Amino, Lipid & Trace Elements → Dietitian Electrolyte Check (188 s) → 12-Channel Gravimetric Fill (233 s) → Filter Integrity & Visual Scan (304 s) → Light-Protective Amber Cover (205 s) → Refrigerated NICU Stat Drop (153 s) → NICU & ICU Beds.SUPPLIERParenteralAmino, Lipid &Trace ElementsI0.80 d1DietitianElectrolyte CheckC/T 188 sI1.11 d212-ChannelGravimetric FillC/T 233 sI1.51 d3Filter Integrity& Visual ScanC/T 304 sI0.60 d4Light-ProtectiveAmber CoverC/T 205 sI0.51 d5Refrigerated NICUStat DropC/T 153 sI0.51 dCUSTOMERNICU & ICU Beds95 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Dietitian Electrolyte Check188 s10 min96%97.8%3876 (0.80 d)127
2. 12-Channel Gravimetric Fill233 s15 min93%98.2%38105 (1.11 d)97
3. Filter Integrity & Visual Scan304 s25 min85%95.8%48143 (1.51 d)64
4. Light-Protective Amber Cover205 s6 min96%99.1%1957 (0.60 d)117
5. Refrigerated NICU Stat Drop153 s5 min98%99.5%1948 (0.51 d)163

Key figures

Takt time
284 s
Lead time
5.06 d
Value-added time
1,083 s
Process cycle efficiency (PCE)
0.79%
Rolled throughput yield (RTY)
90.7%
Customer demand per day
95 packs
Line capacity per day
64 packs
Bottleneck
Filter Integrity & Visual Scan

Reading the bottleneck

The bottleneck is "Filter Integrity & Visual Scan": it can process 64 packs per day against a demand of 95 packs, so it falls short of demand by 32.2%. Once downtime and scrap are counted, its cycle time grows from 304 s to 373 s, against a takt of 284 s. The largest loss at this step is equipment downtime (uptime 85%), about 53.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.