PET/SPECT Radiopharmacy Morning Dose Draw Hub
Product family: Tc-99m Timed Patient Syringes.
Flow: Mo-99 Generators & Cyclotron → Hot-Cell Moly Generator Elute → Kit Tagging & Radio-TLC QC → Dose Calibrator Decay Draw → Lead Pig Shield & Wipe Test → Timed 6AM Hospital Courier → City Nuclear Imaging Hubs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Hot-Cell Moly Generator Elute | 50.0 s | 10 min | 96% | 97.8% | 144 | 288 (0.80 d) | 479 |
| 2. Kit Tagging & Radio-TLC QC | 61.0 s | 15 min | 93% | 98.2% | 144 | 396 (1.10 d) | 371 |
| 3. Dose Calibrator Decay Draw | 80.0 s | 25 min | 85% | 95.8% | 180 | 540 (1.50 d) | 244 |
| 4. Lead Pig Shield & Wipe Test | 54.0 s | 6 min | 96% | 99.1% | 72 | 216 (0.60 d) | 444 |
| 5. Timed 6AM Hospital Courier | 41.0 s | 5 min | 98% | 99.5% | 72 | 180 (0.50 d) | 606 |
Key figures
- Takt time
- 75.0 s
- Lead time
- 5.01 d
- Value-added time
- 286 s
- Process cycle efficiency (PCE)
- 0.21%
- Rolled throughput yield (RTY)
- 90.7%
- Customer demand per day
- 360 vials
- Line capacity per day
- 244 vials
- Bottleneck
- Dose Calibrator Decay Draw
Reading the bottleneck
The bottleneck is "Dose Calibrator Decay Draw": it can process 244 vials per day against a demand of 360 vials, so it falls short of demand by 32.1%. Once downtime and scrap are counted, its cycle time grows from 80.0 s to 98.2 s, against a takt of 75.0 s. The largest loss at this step is equipment downtime (uptime 85%), about 14.1 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hospital Pharmacy & CSSD Sterilization: Hospital Pharmacy & CSSD Sterilization
- Hospital ISO-5 Oncology IV Chemo Compounding
- Hospital Central Sterile (CSSD) Instrument Loop
- Automated High-Bay Mail-Order Chronic Pharmacy
- Neonatal ICU Parenteral Nutrition (TPN) Compounding
- Long-Term Care 7-Day Multi-Med Pouches
- Hospital Automated Ward Cabinet Restock
- Outpatient Antibiotic OPAT & Biologic Pump Kit
- EU-GMP Standardized Medical Cannabis Drying & Dose
- Veterinary Flavor-Chew & Equine Rx Compounding
- Global Clinical Trial Drug Depot Temperature Pick
- Multi-Chair Dental Clinic Cassette Sterilization