Hospital Automated Ward Cabinet Restock

Product family: Unit-Dose Barcode Replenish.

Flow: Main Hospital Pharmacy Vault → Real-Time Par Stock Trigger → Carousel Barcode Pick-to-Bin → Controlled Substance Audit → Trolley Delivery per Floor → Biometric Cabinet Pocket Load → 45 Hospital Nursing Floors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hospital Automated Ward Cabinet RestockSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Main Hospital Pharmacy Vault → Real-Time Par Stock Trigger (8.5 s) → Carousel Barcode Pick-to-Bin (10.5 s) → Controlled Substance Audit (13.8 s) → Trolley Delivery per Floor (9.3 s) → Biometric Cabinet Pocket Load (6.9 s) → 45 Hospital Nursing Floors.SUPPLIERMain HospitalPharmacy VaultI0.80 d1Real-Time ParStock TriggerC/T 8.5 sI1.10 d2Carousel BarcodePick-to-BinC/T 10.5 sI1.50 d3ControlledSubstance AuditC/T 13.8 sI0.60 d4Trolley Deliveryper FloorC/T 9.3 sI0.50 d5Biometric CabinetPocket LoadC/T 6.9 sI0.50 dCUSTOMER45 HospitalNursing Floors4,200 / vials

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Real-Time Par Stock Trigger8.5 s10 min96%97.8%1,6803,360 (0.80 d)5,799
2. Carousel Barcode Pick-to-Bin10.5 s15 min93%98.2%1,6804,620 (1.10 d)4,501
3. Controlled Substance Audit13.8 s25 min85%95.8%2,1006,300 (1.50 d)3,009
4. Trolley Delivery per Floor9.3 s6 min96%99.1%8402,520 (0.60 d)5,340
5. Biometric Cabinet Pocket Load6.9 s5 min98%99.5%8402,100 (0.50 d)7,419

Key figures

Takt time
12.9 s
Lead time
5.00 d
Value-added time
49.0 s
Process cycle efficiency (PCE)
0.018%
Rolled throughput yield (RTY)
90.7%
Customer demand per day
4,200 vials
Line capacity per day
3,009 vials
Bottleneck
Controlled Substance Audit

Reading the bottleneck

The bottleneck is "Controlled Substance Audit": it can process 3,009 vials per day against a demand of 4,200 vials, so it falls short of demand by 28.3%. Once downtime and scrap are counted, its cycle time grows from 13.8 s to 16.9 s, against a takt of 12.9 s. The largest loss at this step is equipment downtime (uptime 85%), about 2.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.