Hospital ISO-5 Oncology IV Chemo Compounding
Product family: Patient-Dosed Cytotoxic Bags.
Flow: Vials, Saline & Closed-System Transfer Devices → Oncologist Dose Verification → Pass-Through Wipe & Stage Kit → Robotic / Pharmacist Iso Mix → Gravimetric +/-2% Barcode Check → Pneumatic Tube / Runner Drop → Day Hospital Infusion Chairs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Oncologist Dose Verification | 127 s | 10 min | 96% | 97.8% | 56 | 112 (0.80 d) | 189 |
| 2. Pass-Through Wipe & Stage Kit | 158 s | 15 min | 93% | 98.2% | 56 | 154 (1.10 d) | 143 |
| 3. Robotic / Pharmacist Iso Mix | 206 s | 25 min | 85% | 95.8% | 70 | 210 (1.50 d) | 95 |
| 4. Gravimetric +/-2% Barcode Check | 139 s | 6 min | 96% | 99.1% | 28 | 84 (0.60 d) | 172 |
| 5. Pneumatic Tube / Runner Drop | 104 s | 5 min | 98% | 99.5% | 28 | 70 (0.50 d) | 239 |
Key figures
- Takt time
- 193 s
- Lead time
- 5.03 d
- Value-added time
- 734 s
- Process cycle efficiency (PCE)
- 0.54%
- Rolled throughput yield (RTY)
- 90.7%
- Customer demand per day
- 140 packs
- Line capacity per day
- 95 packs
- Bottleneck
- Robotic / Pharmacist Iso Mix
Reading the bottleneck
The bottleneck is "Robotic / Pharmacist Iso Mix": it can process 95 packs per day against a demand of 140 packs, so it falls short of demand by 32.2%. Once downtime and scrap are counted, its cycle time grows from 206 s to 253 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 85%), about 36.4 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hospital Pharmacy & CSSD Sterilization: Hospital Pharmacy & CSSD Sterilization
- Hospital Central Sterile (CSSD) Instrument Loop
- Automated High-Bay Mail-Order Chronic Pharmacy
- Neonatal ICU Parenteral Nutrition (TPN) Compounding
- PET/SPECT Radiopharmacy Morning Dose Draw Hub
- Long-Term Care 7-Day Multi-Med Pouches
- Hospital Automated Ward Cabinet Restock
- Outpatient Antibiotic OPAT & Biologic Pump Kit
- EU-GMP Standardized Medical Cannabis Drying & Dose
- Veterinary Flavor-Chew & Equine Rx Compounding
- Global Clinical Trial Drug Depot Temperature Pick
- Multi-Chair Dental Clinic Cassette Sterilization