Long-Term Care 7-Day Multi-Med Pouches
Product family: Nursing Home Compliance Strips.
Flow: Bulk Generic Medication → Nursing MAR Med-List Sync → Automated Multi-Pill Roll Fill → Optical Camera Pill-Count QC → Heat-Seal Daily Time Pouches → Tote Delivery Route Lock → Assisted Living Homes
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Nursing MAR Med-List Sync | 14.9 s | 10 min | 96% | 97.8% | 960 | 1,920 (0.80 d) | 3,308 |
| 2. Automated Multi-Pill Roll Fill | 18.4 s | 15 min | 93% | 98.2% | 960 | 2,640 (1.10 d) | 2,569 |
| 3. Optical Camera Pill-Count QC | 24.1 s | 25 min | 85% | 95.8% | 1,200 | 3,600 (1.50 d) | 1,723 |
| 4. Heat-Seal Daily Time Pouches | 16.2 s | 6 min | 96% | 99.1% | 480 | 1,440 (0.60 d) | 3,065 |
| 5. Tote Delivery Route Lock | 12.2 s | 5 min | 98% | 99.5% | 480 | 1,200 (0.50 d) | 4,196 |
Key figures
- Takt time
- 22.5 s
- Lead time
- 5.00 d
- Value-added time
- 85.8 s
- Process cycle efficiency (PCE)
- 0.032%
- Rolled throughput yield (RTY)
- 90.7%
- Customer demand per day
- 2,400 packs
- Line capacity per day
- 1,723 packs
- Bottleneck
- Optical Camera Pill-Count QC
Reading the bottleneck
The bottleneck is "Optical Camera Pill-Count QC": it can process 1,723 packs per day against a demand of 2,400 packs, so it falls short of demand by 28.2%. Once downtime and scrap are counted, its cycle time grows from 24.1 s to 29.6 s, against a takt of 22.5 s. The largest loss at this step is equipment downtime (uptime 85%), about 4.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hospital Pharmacy & CSSD Sterilization: Hospital Pharmacy & CSSD Sterilization
- Hospital ISO-5 Oncology IV Chemo Compounding
- Hospital Central Sterile (CSSD) Instrument Loop
- Automated High-Bay Mail-Order Chronic Pharmacy
- Neonatal ICU Parenteral Nutrition (TPN) Compounding
- PET/SPECT Radiopharmacy Morning Dose Draw Hub
- Hospital Automated Ward Cabinet Restock
- Outpatient Antibiotic OPAT & Biologic Pump Kit
- EU-GMP Standardized Medical Cannabis Drying & Dose
- Veterinary Flavor-Chew & Equine Rx Compounding
- Global Clinical Trial Drug Depot Temperature Pick
- Multi-Chair Dental Clinic Cassette Sterilization