Hospital Central Sterile (CSSD) Instrument Loop
Product family: Reprocessed 40-Instrument Trays.
Flow: Operating Theater Soiled → Enzymatic Pre-Soak & Ultrasonic → Washer-Disinfector 93°C Cycle → Optical Loupe Assemble & Count → Steam Autoclave 134°C 18-Min → Cool Check & Case Cart Pull → 8 Hospital Operating Suites
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Enzymatic Pre-Soak & Ultrasonic | 127 s | 10 min | 96% | 97.8% | 112 | 224 (0.80 d) | 388 |
| 2. Washer-Disinfector 93°C Cycle | 158 s | 15 min | 93% | 98.2% | 112 | 308 (1.10 d) | 299 |
| 3. Optical Loupe Assemble & Count | 206 s | 25 min | 85% | 95.8% | 140 | 420 (1.50 d) | 202 |
| 4. Steam Autoclave 134°C 18-Min | 139 s | 6 min | 96% | 99.1% | 56 | 168 (0.60 d) | 357 |
| 5. Cool Check & Case Cart Pull | 104 s | 5 min | 98% | 99.5% | 56 | 140 (0.50 d) | 492 |
Key figures
- Takt time
- 193 s
- Lead time
- 5.01 d
- Value-added time
- 734 s
- Process cycle efficiency (PCE)
- 0.27%
- Rolled throughput yield (RTY)
- 90.7%
- Customer demand per day
- 280 crates
- Line capacity per day
- 202 crates
- Bottleneck
- Optical Loupe Assemble & Count
Reading the bottleneck
The bottleneck is "Optical Loupe Assemble & Count": it can process 202 crates per day against a demand of 280 crates, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 206 s to 253 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 85%), about 36.4 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hospital Pharmacy & CSSD Sterilization: Hospital Pharmacy & CSSD Sterilization
- Hospital ISO-5 Oncology IV Chemo Compounding
- Automated High-Bay Mail-Order Chronic Pharmacy
- Neonatal ICU Parenteral Nutrition (TPN) Compounding
- PET/SPECT Radiopharmacy Morning Dose Draw Hub
- Long-Term Care 7-Day Multi-Med Pouches
- Hospital Automated Ward Cabinet Restock
- Outpatient Antibiotic OPAT & Biologic Pump Kit
- EU-GMP Standardized Medical Cannabis Drying & Dose
- Veterinary Flavor-Chew & Equine Rx Compounding
- Global Clinical Trial Drug Depot Temperature Pick
- Multi-Chair Dental Clinic Cassette Sterilization