Global Clinical Trial Drug Depot Temperature Pick

Product family: Comparator & Study Kits.

Flow: Sponsor GMP Packagers → RTSM Automated Kit Trigger → 2–8°C / -20°C Vault Pick → Qualified Cold Box Load → Customs Clinical Permit Pack → Courier Temp Upload Proof → Multicenter Hospital Sites

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Global Clinical Trial Drug Depot Temperature PickSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Sponsor GMP Packagers → RTSM Automated Kit Trigger (74.0 s) → 2–8°C / -20°C Vault Pick (92.0 s) → Qualified Cold Box Load (120 s) → Customs Clinical Permit Pack (81.0 s) → Courier Temp Upload Proof (61.0 s) → Multicenter Hospital Sites.SUPPLIERSponsor GMPPackagersI0.80 d1RTSM AutomatedKit TriggerC/T 74.0 sI1.10 d22–8°C / -20°CVault PickC/T 92.0 sI1.50 d3Qualified ColdBox LoadC/T 120 sI0.60 d4Customs ClinicalPermit PackC/T 81.0 sI0.50 d5Courier TempUpload ProofC/T 61.0 sI0.50 dCUSTOMERMulticenterHospital Sites240 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. RTSM Automated Kit Trigger74.0 s10 min96%97.8%96192 (0.80 d)324
2. 2–8°C / -20°C Vault Pick92.0 s15 min93%98.2%96264 (1.10 d)246
3. Qualified Cold Box Load120 s25 min85%95.8%120360 (1.50 d)163
4. Customs Clinical Permit Pack81.0 s6 min96%99.1%48144 (0.60 d)296
5. Courier Temp Upload Proof61.0 s5 min98%99.5%48120 (0.50 d)408

Key figures

Takt time
113 s
Lead time
5.02 d
Value-added time
428 s
Process cycle efficiency (PCE)
0.32%
Rolled throughput yield (RTY)
90.7%
Customer demand per day
240 crates
Line capacity per day
163 crates
Bottleneck
Qualified Cold Box Load

Reading the bottleneck

The bottleneck is "Qualified Cold Box Load": it can process 163 crates per day against a demand of 240 crates, so it falls short of demand by 32.1%. Once downtime and scrap are counted, its cycle time grows from 120 s to 147 s, against a takt of 113 s. The largest loss at this step is equipment downtime (uptime 85%), about 21.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Hospital Pharmacy & CSSD Sterilization: Hospital Pharmacy & CSSD Sterilization