Industrial & Heavy Equipment OEMs VSM Scenarios

12 scenarios of Industrial & Heavy Equipment OEMs, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Heavy Plate Bevel & Tack → Submerged-Arc Structure Weld → 5-Face Bridge Gantry Bore → Machine Fit-Up & Piping → Laser Align & 48h Run-Off. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
5-Axis Turn-Mill Center Machine Bed & Head6 units per day14,500 s11.8 d5.8%Hybrid Ceramic Spindle Build
650-Ton All-Electric Toggle Injection Press5 units per day15,400 s12.4 d6.6%Servo Ballscrew Toggle Mount
Self-Propelled Combine Harvester Thresher Line10 units per day25,400 s11.6 d3.5%Rotary Rotor & Engine Drop
8m³ Spiral-Blade Truck Concrete Mixer Drum24 units per day22,250 s11.4 d1.5%Track Ring Lathe Turn
25-Ton Double-Girder Overhead Bridge Crane8 units per day13,375 s11.6 d4.4%End-Truck Wheel Bogie Bore
20-Ton Articulated Quarry Wheel Loader14 units per day23,857 s11.5 d2.5%Axle, Trans & Engine Drop
PE-1200 Heavy Primary Quarry Jaw Crusher Frame5 units per day15,400 s12.4 d6.6%18% Mn Pitman Jaw Casting Fit
Forged Hollow 7MW Offshore Wind Main Shaft5 parts per day210,800 s12.4 d6.6%Gantry Lathe & Bearing Grind
4-High Cold Steel Rolling Mill Housing Stand2 units per day113,500 s13.5 d15.1%Chock Window Liner Slide Fit
Cast-Steel Cement Rotary Kiln Riding Ring3 parts per day19,000 s12.7 d10.7%7m Vertical Boring Mill Face
Cast-Iron Electric Counterbalance Forklift Build65 units per day2831 s11.3 d0.56%Triplex Mast & Tilt Ram Mate
150-Ton Constant-Tension Offshore Mooring Winch6 units per day14,500 s11.8 d5.8%Epoxy Marine Coating 450um