8m³ Spiral-Blade Truck Concrete Mixer Drum

Product family: Wear-Resistant Plate Drums.

Flow: 4mm wear-plate supplier → Plate Roll & Seam Fit → Continuous Internal Spiral Weld → Track Ring Lathe Turn → Zinc Blast & Polyurethane Coat → Chute, Water Tank & Hydro Test → Ready-Mix Concrete Fleets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 8m³ Spiral-Blade Truck Concrete Mixer DrumSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 4mm wear-plate supplier → Plate Roll & Seam Fit (1,530 s) → Continuous Internal Spiral Weld (1,913 s) → Track Ring Lathe Turn (2,475 s) → Zinc Blast & Polyurethane Coat (1,845 s) → Chute, Water Tank & Hydro Test (1,440 s) → Ready-Mix Concrete Fleets.SUPPLIER4mm wear-platesupplierI2.08 d1Plate Roll & SeamFitC/T 1,530 sI2.42 d2ContinuousInternal Spiral…C/T 1,913 sI2.79 d3Track Ring LatheTurnC/T 2,475 sI1.50 d4Zinc Blast &Polyurethane CoatC/T 1,845 sI0.92 d5Chute, Water Tank& Hydro TestC/T 1,440 sI1.50 dCUSTOMERReady-MixConcrete Fleets24 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Plate Roll & Seam Fit1,530 s30 min94%98.5%3650 (2.08 d)32
2. Continuous Internal Spiral Weld1,913 s45 min89%96.4%2458 (2.42 d)23
3. Track Ring Lathe Turn2,475 s90 min83%95.8%2467 (2.79 d)16
4. Zinc Blast & Polyurethane Coat1,845 s20 min92%97.4%1236 (1.50 d)25
5. Chute, Water Tank & Hydro Test1,440 s15 min95%98.9%622 (0.92 d)33

Key figures

Takt time
2,250 s
Lead time
11.4 d
Value-added time
9,203 s
Process cycle efficiency (PCE)
1.5%
Rolled throughput yield (RTY)
87.6%
Customer demand per day
24 units
Line capacity per day
16 units
Bottleneck
Track Ring Lathe Turn

Reading the bottleneck

The bottleneck is "Track Ring Lathe Turn": it can process 16 units per day against a demand of 24 units, so it falls short of demand by 34.9%. Once downtime and scrap are counted, its cycle time grows from 2,475 s to 3,113 s, against a takt of 2,250 s. The largest loss at this step is equipment downtime (uptime 83%), about 507 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Industrial & Heavy Equipment OEMs: Industrial & Heavy Equipment OEMs