150-Ton Constant-Tension Offshore Mooring Winch

Product family: Electro-Hydraulic Marine Winches.

Flow: Marine Plate & Drum Cast → Grooved Drum CNC Cut → Side Cheek Structural Weld → Epoxy Marine Coating 450um → Band Brake & Load Cell Mount → Dynamic Tension Brake Test → Offshore Supply Vessels

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 150-Ton Constant-Tension Offshore Mooring WinchSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Marine Plate & Drum Cast → Grooved Drum CNC Cut (3,060 s) → Side Cheek Structural Weld (3,825 s) → Epoxy Marine Coating 450um (4,950 s) → Band Brake & Load Cell Mount (3,690 s) → Dynamic Tension Brake Test (2,880 s) → Offshore Supply Vessels.SUPPLIERMarine Plate &Drum CastI2.17 d1Grooved Drum CNCCutC/T 3,060 sI2.33 d2Side CheekStructural WeldC/T 3,825 sI2.83 d3Epoxy MarineCoating 450umC/T 4,950 sI1.50 d4Band Brake & LoadCell MountC/T 3,690 sI0.83 d5Dynamic TensionBrake TestC/T 2,880 sI1.50 dCUSTOMEROffshore SupplyVessels6 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Grooved Drum CNC Cut3,060 s30 min94%98.5%913 (2.17 d)8
2. Side Cheek Structural Weld3,825 s45 min89%96.4%614 (2.33 d)5
3. Epoxy Marine Coating 450um4,950 s90 min83%95.8%617 (2.83 d)3
4. Band Brake & Load Cell Mount3,690 s20 min92%97.4%39 (1.50 d)6
5. Dynamic Tension Brake Test2,880 s15 min95%98.9%25 (0.83 d)8

Key figures

Takt time
4,500 s
Lead time
11.8 d
Value-added time
18,405 s
Process cycle efficiency (PCE)
5.8%
Rolled throughput yield (RTY)
87.6%
Customer demand per day
6 units
Line capacity per day
3 units
Bottleneck
Epoxy Marine Coating 450um

Reading the bottleneck

The bottleneck is "Epoxy Marine Coating 450um": it can process 3 units per day against a demand of 6 units, so it falls short of demand by 42.2%. Once downtime and scrap are counted, its cycle time grows from 4,950 s to 6,225 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 83%), about 1,014 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Industrial & Heavy Equipment OEMs: Industrial & Heavy Equipment OEMs