5-Axis Turn-Mill Center Machine Bed & Head

Product family: High-Rigidity Polymer-Concrete Lathes.

Flow: Cast iron beds → Epoxy-Granite Pour & Cure → 5-Face Box-Way Finish Mill → Hybrid Ceramic Spindle Build → Turret & CNC Wiring → Circular-Test Laser Cert → Global Tier-1 Machine Shops

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 5-Axis Turn-Mill Center Machine Bed & HeadSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cast iron beds → Epoxy-Granite Pour & Cure (3,060 s) → 5-Face Box-Way Finish Mill (3,825 s) → Hybrid Ceramic Spindle Build (4,950 s) → Turret & CNC Wiring (3,690 s) → Circular-Test Laser Cert (2,880 s) → Global Tier-1 Machine Shops.SUPPLIERCast iron bedsI2.17 d1Epoxy-GranitePour & CureC/T 3,060 sI2.33 d25-Face Box-WayFinish MillC/T 3,825 sI2.83 d3Hybrid CeramicSpindle BuildC/T 4,950 sI1.50 d4Turret & CNCWiringC/T 3,690 sI0.83 d5Circular-TestLaser CertC/T 2,880 sI1.50 dCUSTOMERGlobal Tier-1Machine Shops6 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Epoxy-Granite Pour & Cure3,060 s30 min94%98.5%913 (2.17 d)8
2. 5-Face Box-Way Finish Mill3,825 s45 min89%96.4%614 (2.33 d)5
3. Hybrid Ceramic Spindle Build4,950 s90 min83%95.8%617 (2.83 d)3
4. Turret & CNC Wiring3,690 s20 min92%97.4%39 (1.50 d)6
5. Circular-Test Laser Cert2,880 s15 min95%98.9%25 (0.83 d)8

Key figures

Takt time
4,500 s
Lead time
11.8 d
Value-added time
18,405 s
Process cycle efficiency (PCE)
5.8%
Rolled throughput yield (RTY)
87.6%
Customer demand per day
6 units
Line capacity per day
3 units
Bottleneck
Hybrid Ceramic Spindle Build

Reading the bottleneck

The bottleneck is "Hybrid Ceramic Spindle Build": it can process 3 units per day against a demand of 6 units, so it falls short of demand by 42.2%. Once downtime and scrap are counted, its cycle time grows from 4,950 s to 6,225 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 83%), about 1,014 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.