PE-1200 Heavy Primary Quarry Jaw Crusher Frame
Product family: Manganese Jaw Crushing Units.
Flow: 18% Mn Steel Foundry → Side-Plate Bolt & Weld Box → Giant CNC Eccentric Bearing Bore → 18% Mn Pitman Jaw Casting Fit → Flywheel Taper Shrink Mount → No-Load Vibration & Bearing Run → Mine Aggregate Operators
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Side-Plate Bolt & Weld Box | 3,672 s | 30 min | 94% | 98.5% | 8 | 11 (2.20 d) | 7 |
| 2. Giant CNC Eccentric Bearing Bore | 4,590 s | 45 min | 89% | 96.4% | 5 | 12 (2.40 d) | 5 |
| 3. 18% Mn Pitman Jaw Casting Fit | 5,940 s | 90 min | 83% | 95.8% | 5 | 14 (2.80 d) | 3 |
| 4. Flywheel Taper Shrink Mount | 4,428 s | 20 min | 92% | 97.4% | 3 | 8 (1.60 d) | 5 |
| 5. No-Load Vibration & Bearing Run | 3,456 s | 15 min | 95% | 98.9% | 1 | 5 (1.00 d) | 7 |
Key figures
- Takt time
- 5,400 s
- Lead time
- 12.4 d
- Value-added time
- 22,086 s
- Process cycle efficiency (PCE)
- 6.6%
- Rolled throughput yield (RTY)
- 87.6%
- Customer demand per day
- 5 units
- Line capacity per day
- 3 units
- Bottleneck
- 18% Mn Pitman Jaw Casting Fit
Reading the bottleneck
The bottleneck is "18% Mn Pitman Jaw Casting Fit": it can process 3 units per day against a demand of 5 units, so it falls short of demand by 42.2%. Once downtime and scrap are counted, its cycle time grows from 5,940 s to 7,470 s, against a takt of 5,400 s. The largest loss at this step is equipment downtime (uptime 83%), about 1,217 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Industrial & Heavy Equipment OEMs: Industrial & Heavy Equipment OEMs
- 5-Axis Turn-Mill Center Machine Bed & Head
- 650-Ton All-Electric Toggle Injection Press
- Self-Propelled Combine Harvester Thresher Line
- 8m³ Spiral-Blade Truck Concrete Mixer Drum
- 25-Ton Double-Girder Overhead Bridge Crane
- 20-Ton Articulated Quarry Wheel Loader
- Forged Hollow 7MW Offshore Wind Main Shaft
- 4-High Cold Steel Rolling Mill Housing Stand
- Cast-Steel Cement Rotary Kiln Riding Ring
- Cast-Iron Electric Counterbalance Forklift Build
- 150-Ton Constant-Tension Offshore Mooring Winch