Microchannel V-Bank Adiabatic Air Condenser

Product family: Dry Coolers for Data Centers.

Flow: Aluminum Micro-Extrusion → Multi-Port Tube & Header Stamp → CAB Nitrogen Brazing Line → V-Frame Aluminum Assembly → EC Axial Fan & Mist Spray Fit → 30-Bar Nitrogen Pressure Hold → Cooling Integrators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Microchannel V-Bank Adiabatic Air CondenserSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aluminum Micro-Extrusion → Multi-Port Tube & Header Stamp (1,020 s) → CAB Nitrogen Brazing Line (1,290 s) → V-Frame Aluminum Assembly (1,620 s) → EC Axial Fan & Mist Spray Fit (1,170 s) → 30-Bar Nitrogen Pressure Hold (900 s) → Cooling Integrators.SUPPLIERAluminumMicro-ExtrusionI1.69 d1Multi-Port Tube &Header StampC/T 1,020 sI1.81 d2CAB NitrogenBrazing LineC/T 1,290 sI2.19 d3V-Frame AluminumAssemblyC/T 1,620 sI1.11 d4EC Axial Fan &Mist Spray FitC/T 1,170 sI0.81 d530-Bar NitrogenPressure HoldC/T 900 sI1.50 dCUSTOMERCoolingIntegrators36 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Multi-Port Tube & Header Stamp1,020 s35 min93%98.7%5461 (1.69 d)47
2. CAB Nitrogen Brazing Line1,290 s30 min90%96.9%2965 (1.81 d)35
3. V-Frame Aluminum Assembly1,620 s45 min84%95.5%3679 (2.19 d)25
4. EC Axial Fan & Mist Spray Fit1,170 s15 min94%98.3%1440 (1.11 d)41
5. 30-Bar Nitrogen Pressure Hold900 s8 min96%99.1%729 (0.81 d)54

Key figures

Takt time
1,500 s
Lead time
9.22 d
Value-added time
6,000 s
Process cycle efficiency (PCE)
1.2%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
36 units
Line capacity per day
25 units
Bottleneck
V-Frame Aluminum Assembly

Reading the bottleneck

The bottleneck is "V-Frame Aluminum Assembly": it can process 25 units per day against a demand of 36 units, so it falls short of demand by 29.4%. Once downtime and scrap are counted, its cycle time grows from 1,620 s to 2,019 s, against a takt of 1,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 309 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.