Compact Brushless Industrial Servo Motor

Product family: 400V 10kW Precision Servos.

Flow: NdFeB magnet supplier → Segmented Stator Needle Wind → Trickle Resin Cure Bake → N42SH Magnet Rotor Banding → 24-Bit Absolute Encoder Mate → Torque-Ripple Back-EMF QC → Packaging & CNC OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Compact Brushless Industrial Servo MotorSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. NdFeB magnet supplier → Segmented Stator Needle Wind (59.0 s) → Trickle Resin Cure Bake (75.0 s) → N42SH Magnet Rotor Banding (94.0 s) → 24-Bit Absolute Encoder Mate (68.0 s) → Torque-Ripple Back-EMF QC (52.0 s) → Packaging & CNC OEMs.SUPPLIERNdFeB magnetsupplierI1.70 d1Segmented StatorNeedle WindC/T 59.0 sI1.80 d2Trickle ResinCure BakeC/T 75.0 sI2.20 d3N42SH MagnetRotor BandingC/T 94.0 sI1.10 d424-Bit AbsoluteEncoder MateC/T 68.0 sI0.80 d5Torque-RippleBack-EMF QCC/T 52.0 sI1.50 dCUSTOMERPackaging & CNCOEMs620 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Segmented Stator Needle Wind59.0 s35 min93%98.7%9301,054 (1.70 d)818
2. Trickle Resin Cure Bake75.0 s30 min90%96.9%4961,116 (1.80 d)602
3. N42SH Magnet Rotor Banding94.0 s45 min84%95.5%6201,364 (2.20 d)438
4. 24-Bit Absolute Encoder Mate68.0 s15 min94%98.3%248682 (1.10 d)703
5. Torque-Ripple Back-EMF QC52.0 s8 min96%99.1%124496 (0.80 d)944

Key figures

Takt time
87.1 s
Lead time
9.11 d
Value-added time
348 s
Process cycle efficiency (PCE)
0.071%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
620 units
Line capacity per day
438 units
Bottleneck
N42SH Magnet Rotor Banding

Reading the bottleneck

The bottleneck is "N42SH Magnet Rotor Banding": it can process 438 units per day against a demand of 620 units, so it falls short of demand by 29.4%. Once downtime and scrap are counted, its cycle time grows from 94.0 s to 117 s, against a takt of 87.1 s. The largest loss at this step is equipment downtime (uptime 84%), about 17.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.